Laserfiche WebLink
Task description: <br />Site: New Horizon Mine <br />Pagel of 2 <br />SCRAPER TEAM WORK <br />Replace topsoil on Pond 011 <br />Permit Action: Phase IVIII Bond <br />Release SL -12 and <br />PR -6 Permit/Job #: C1981008 <br />PROJECT IDENTIFICATION <br />Task #: 53B State: Colorado. Abbreviation: None <br />Date: 11/18/2011 County: Montrose Filename: C008 -53b <br />User: SLB <br />Agency or organization name: Colorado Division of Reclamation, Mining and Safety <br />HOURLY EQUIPMENT <br />- Scraper: I Cat 637G <br />- Dozer: F NA <br />Support Equipment -Load Area: <br />-Dump Area: <br />Road Maintenance —Motor Grader: <br />-Water Truck: <br />NA <br />NA <br />NA <br />NA <br />COSTShift basis: 1 per day <br />!, _* 72--- IZ—. ar W—t- T—m Qnnnnrt Frminme.nt Maintenance Eauinment <br />Total work team cost/hour: $711.40 <br />MATERIAL OUANTITIES <br />Initial volume: 8,962 CCY Swell factor: 1.100 <br />Loose volume: 9,858 LCY <br />Source of estimated volume: 3.03 acres, 22" depth <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Material weight: 2,1001bs /LCY <br />Material description: User Provided <br />Rated Payload: 81,600 pounds <br />Payload Capacity: 38.86 LCY <br />Scraper Bowl (volume) Basis: <br />Struck Volume: <br />Scraper <br />Dozer <br />Load Area <br />Dump Area <br />Motor Grader <br />Water Truck <br />%Utilization- machine: <br />100 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Ownership cost/hour: <br />$101.01 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Operating cost/hour: <br />$229.74 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Ripper op. cost/hour: <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />Operator cost/hour: <br />$24.95 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Unit Subtotals: <br />$355.70 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Number of Units: <br />2 <br />0 <br />0 <br />0 <br />0 <br />0 <br />Group Subtotals: <br />Work: <br />$711.40 <br />Support: <br />$0.00 <br />Maint: <br />$0.00 <br />Total work team cost/hour: $711.40 <br />MATERIAL OUANTITIES <br />Initial volume: 8,962 CCY Swell factor: 1.100 <br />Loose volume: 9,858 LCY <br />Source of estimated volume: 3.03 acres, 22" depth <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Material weight: 2,1001bs /LCY <br />Material description: User Provided <br />Rated Payload: 81,600 pounds <br />Payload Capacity: 38.86 LCY <br />Scraper Bowl (volume) Basis: <br />Struck Volume: <br />24.00 <br />LCY <br />Heaped Volume: <br />34.00 <br />LCY <br />Average Volume: <br />29.00 <br />LCY <br />Adjusted Capacity: <br />29.00 <br />LCY <br />CIRCES Cost Estimating Software <br />