Laserfiche WebLink
Task description: <br />Site: New Horizon Mine <br />Page 1 of 2 <br />SCRAPER TEAM WORK <br />Replace topsoil on Pond 009 <br />Permit Action: Phase II/III Bond <br />Release SL -12 and <br />PR -f, Permit/Job #: C1981008 <br />PROJECT IDENTIFICATION <br />Task #: 51B State: Colorado <br />Date: 11/18/2011 County: Montrose <br />User: SLB <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT <br />- Scraper: Cat 637G <br />- Dozer: NA <br />JUIJIJ Vl� Lill UlkJILVLt -LVUY lava. <br />-Dump Area: NA <br />Road Maintenance —Motor Grader: NA <br />-Water Truck: NA <br />Abbreviation: None <br />Filename: C008 -51b <br />COSTShift basis: 1 per day <br />o..__,.... Mn;ntPnannP Pnninment <br />I.VJI nrcanuvn•u. <br />.�a.auya.a .. <br />Scraper <br />.,,.. <br />Dozer <br />.._ - -- — z- -- a- <br />Load Area <br />- - - - -- <br />Dump Area <br />Motor Grader <br />Water Truck <br />%Utilization- machine: <br />100 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Ownership cost/hour: <br />$101.01 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Operating cost/hour: <br />$229.74 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Ripper op. costihour: <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />Operator cost/hour: <br />$24.95 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Unit Subtotals: <br />$355.70 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Number of Units: <br />2 J <br />0 <br />0 <br />0 <br />0 <br />0 <br />Group Subtotals: <br />Work: <br />1 $711.40 <br />Support: <br />$0.00 <br />1 Maint: <br />$0.00 <br />Total work team cost/hour: 7$ 11.40 <br />MATERIAL QUANTITIES <br />Initial volume: 3,017 CCY Swell factor: 1.100 <br />Loose volume: 3,319 LCY <br />Source of estimated volume: 1.02 acres, 22" depth <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />CIRCES Cost Estimating Software <br />Scraper Bowl (volume) Basis: <br />Material weight: <br />2,100 lbs /LCY <br />Struck Volume: <br />24.00 <br />LCY <br />Material description: <br />User Provided <br />Heaped Volume: <br />34.00 <br />LCY <br />Rated Payload: <br />81,600 pounds <br />Average Volume: <br />29.00 <br />LCY <br />Payload Capacity: <br />38.86 LCY <br />Adjusted Capacity: <br />29.00 <br />LCY <br />CIRCES Cost Estimating Software <br />