Laserfiche WebLink
Task description: <br />Site: New Horizon Mine <br />Page 1 of 2 <br />SCRAPER TEAM WORK <br />Replace topsoil on 10.17 acre area NE Sec 6 <br />Permit Action: Phase II/III Bond <br />Release SL -12 and. <br />PR -6 Permit/Job #: C1981008 <br />PROJECT IDENTIFICATION <br />Task #: 36A State: Colorado Abbreviation: None <br />Date: 11/18/2011 County: Montrose Filename: C008 -36a <br />User: SLB <br />Agency or organization name: Colorado Division of Reclamation, Mining and Safety <br />HOURLY EOUIPMENT <br />- Scraper: Cat 637G <br />- Dozer: NA <br />Support Equipment -Load Area: <br />-Dump Area: <br />Road Maintenance —Motor Grader: <br />-Water Truck: <br />NA <br />NA <br />NA <br />NA <br />COSTShift basis: 1 per day <br />o------ Qnnnnrt Fn11;nmPnt Maintenance Eauipment <br />Total work team cost/hour: $1,422.80 <br />MATERIAL OUANTITIES <br />Initial volume: 38,284 CCY Swell factor: 1.100 <br />Loose volume: 42,112 LCY <br />Source of estimated volume: Map 2.05.5 -4, 10.17 acres 28" depth <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />.Material weight: 2,100 lbs /LCY <br />Material description: User Provided <br />Rated Payload: 81,600 pounds <br />Payload Capacity: 38.86 LCY <br />Scraper Bowl (volume) Basis: <br />Struck Volume: <br />Scraper <br />Dozer <br />Load Area <br />Dump Area <br />Motor Grader <br />Water Truck <br />%Utilization- machine: <br />100 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Ownership cost/hour: <br />$101.01 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Operating cost/hour: <br />$229.74 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Ripper op. cost/hour: <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />Operator cost/hour: <br />$24.95 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Unit Subtotals: <br />$355.70 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Number of Units: <br />4 <br />0 <br />0 <br />0 <br />0 <br />0 <br />Group Subtotals: <br />Work: <br />$1,422.80 <br />Support: <br />$0.00 <br />Maint: <br />$0.00 <br />Total work team cost/hour: $1,422.80 <br />MATERIAL OUANTITIES <br />Initial volume: 38,284 CCY Swell factor: 1.100 <br />Loose volume: 42,112 LCY <br />Source of estimated volume: Map 2.05.5 -4, 10.17 acres 28" depth <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />.Material weight: 2,100 lbs /LCY <br />Material description: User Provided <br />Rated Payload: 81,600 pounds <br />Payload Capacity: 38.86 LCY <br />Scraper Bowl (volume) Basis: <br />Struck Volume: <br />24.00 <br />LCY <br />Heaped Volume: <br />34.00 <br />LCY <br />Average Volume: <br />29.00 <br />LCY <br />Adjusted Capacity: <br />29.00 <br />LCY <br />CIRCES Cost Estimating Software <br />