Laserfiche WebLink
Task description: <br />Site: New Horizon Mine <br />Page 1 of 2 <br />SCRAPER TEAM WORK <br />Replace topsoil on 2.83 ac WFC property (Pond 013 - Zone 8) <br />Permit Action: Phase II/III Bond <br />Release SL -12 and <br />PR -6 Perrnit/Job #: C1981008 <br />PROJECT IDENTIFICATION <br />Task #: 30F State: Colorado Abbreviation: None <br />Date: 11/18/2011 County: Montrose Filename: C008 -30f <br />User: SLB <br />Agency or organization name: Colorado Division of Reclamation, Mining and Safety <br />HOURLY EQUIPMENT <br />- Scraper: Cat 637G <br />- Dozer: NA <br />Support Equipment -Load Area: NA <br />-Dump Area: NA <br />Road Maintenance -Motor Grader: NA <br />-Water Truck: NA <br />COSTShift basis: 1 per day <br />e­..e..111- v r-.— Qnnnnrt Frniinment Maintenance F.auinment <br />Total work team cost/hour: $711.40 <br />MATERIAL OUANTITIES <br />Initial volume: 21,307 <br />Scraper <br />Dozer <br />Load Area <br />Dump Area <br />Motor Grader <br />Water Truck <br />%Utilization- machine: <br />100 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Ownership cost/hour: <br />$101.01 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Operating cost/hour: <br />$229.74 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Ripper op. cost/hour: <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />Operator cost/hour: <br />$24.95 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Unit Subtotals: <br />$355.70 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Number of Units: <br />2 <br />0 <br />0 <br />0 <br />0 <br />0 <br />Group Subtotals: <br />Work: <br />$711.40 <br />Support: <br />$0.00 <br />Maint: <br />$0.00 <br />Total work team cost/hour: $711.40 <br />MATERIAL OUANTITIES <br />Initial volume: 21,307 <br />CCY Swell factor: 1.100 <br />Loose volume: 23,438 <br />LCY <br />Source of estimated volume: <br />Map 2.05.4 -7, 38" A/B, 18" sub <br />Source of estimated swell factor: <br />Cat Handbook <br />HOURLY PRODUCTION <br />Scraper Bowl (volume) Basis: <br />Material weight: 2,100 lbs /LCY <br />Struck Volume: 24.00 <br />LCY <br />Material description: User Provided <br />Heaped Volume: 34.00 <br />LCY <br />Rated Payload: 81,600 pounds <br />Average Volume: 29.00 <br />LCY <br />Payload Capacity: 38.86 LCY <br />Adjusted Capacity: 29.00 <br />LCY <br />CIRCES Cost Estimating Software <br />