Laserfiche WebLink
068 <br />069 <br />070 <br />071 <br />075 <br />076 <br />081 <br />082 <br />083 <br />084 <br />085 <br />086 <br />087 <br />088 <br />089 <br />090 <br />091 <br />092 <br />093 <br />094 <br />095 <br />096 <br />097 <br />098 <br />099 <br />100 <br />30a <br />30b <br />30c <br />30d <br />30e <br />30f <br />36a <br />51b <br />52b <br />53b <br />54b <br />56b <br />68a <br />69a <br />Cost Summary Worksheet Cont'd Task # 000 <br />Drill seed Irrigated Pasture Grass - No Release <br />REVEGE <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />2 <br />2 <br />2 <br />2 <br />2 <br />1 <br />2 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />47.62 <br />Drill seed Dryland Pasture - No Release <br />REVEGE <br />189.03 <br />Drill seed Irrigated Pastureland Swale - Phase II <br />granted <br />REVEGE <br />4.00 <br />Drill seed Irrigated Cropland - No Release - Green <br />Manure <br />REVEGE <br />111.92 <br />Mobilize equipment for inital reclamation - <br />breakdown re 'd <br />MOBILIZE <br />25.77 <br />Mobilize large equipment for pond and ditch <br />reclamation <br />MOBILIZE <br />25.77 <br />Rip BB Road Detour <br />RIPPER <br />7.47 <br />Haul BB Road surface material to pit <br />TRUCKI <br />2.06 <br />Haul BB Road Fill Material <br />SCRAPERI <br />4.69 <br />Rip NE Haul Road surface <br />RIPPER <br />6.53 <br />Regrade NE Haul Road corridor <br />DOZER <br />25.19 <br />Rip SW Haul Road surface <br />RIPPER <br />7.37 <br />Regrade SW Haul Road surface material <br />DOZER <br />28.79 <br />Rip 5th Street surface (reclaimed portion) <br />RIPPER <br />1.46 <br />Regrade 5th Street surface material <br />DOZER <br />5.68 <br />BBRoad Pavement/Gravel <br />MISCTRUK <br />40.00 <br />2700 Road Pavement/Gravel <br />MISCTRUK <br />40.00 <br />Compact 15' native material in base of <br />reconstructed BB road <br />COMPACT <br />88.82 <br />Compact 15' native material base of reconstructed <br />2700 Road <br />COMPACT <br />34.01 <br />Construct roadside ditches on reconstructed BB <br />Road <br />GRADER <br />16.41 <br />Construct roadside ditches on reconstructed 2700 <br />Road <br />GRADER <br />771 <br />Finish grade BB Road detour corridor <br />GRADER <br />6.37 <br />Irrigation <br />NA <br />300.00 <br />Spoil Testing <br />NA <br />16.00 <br />Site Maintenance <br />NA <br />40.00 <br />Site Maintenance <br />NA <br />200.00 <br />Replace topsoil on 20.02 ac Morgan property, <br />Zones 1 -2 <br />SCRAPERI <br />50.45 <br />Replace topsoil on 31.68 ac Morgan property Zone <br />3 <br />SCRAPERI <br />135.47 <br />Replace topsoil on 54.33 ac Morgan property Zone <br />4 <br />SCRAPERI <br />267.06 <br />Replace topsoil on 106.8 ac Lloyd/Benson property <br />Zone 6 <br />SCRAPERI <br />277.49 <br />Replace topsoil on 100.6 ac WFC /Lloyd property <br />Zone 7 <br />SCRAPERI <br />182.96 <br />Replace topsoil on 2.83 ac WFC property (Pond <br />013 - Zone 8) <br />SCRAPERI <br />14.93 <br />Replace topsoil on 10.17 acre area NE Sec 6 <br />SCRAPERI <br />13.49 <br />Replace topsoil on Pond 009 <br />SCRAPERI <br />1.96 <br />Replace topsoil on Pond 010 <br />SCRAPERI <br />2.74 <br />Replace topsoil on Pond 011 <br />SCRAPERI <br />5.84 <br />Replace topsoil on Pond 012 <br />SCRAPERI <br />1.71 <br />Replace topsoil on Pond 014 <br />SCRAPERI <br />0.16 <br />Drill Seed Irrigated Pasture Grass - Phase II <br />Granted <br />REVEGE <br />258.96 <br />Drill seed Dryland Pasture - Phase II granted I <br />REVEGE <br />34.58 <br />Page 2 of 3 <br />$20,969.44 <br />$50,605.79 <br />$897.36 <br />$34,373.71 <br />$51,121.55 <br />$4,761.35 <br />$2,022.00 <br />$1,330.15 <br />$6,781.35 <br />$1,742.00 <br />$6,337.96 <br />$1,965.00 <br />$7,242.79 <br />$389.00 <br />$1,428.67 <br />$403,746.00 <br />$247,821.00 <br />$15,999.00 <br />$6,128.00 <br />$1,267.00 <br />$518.00 <br />$620.00 <br />$437,090.17 <br />$1,000.00 <br />$17,424.00 <br />$26,176.00 <br />$71,773.75 <br />$192,751.27 <br />$379,975.31 <br />$394,808.57 <br />$260,311.23 <br />$10,621.59 <br />$19,188.38 <br />$1,397.72 <br />$1,945.78 <br />$4,151.93 <br />$1,219.36 <br />$112.11 <br />$41,160.10 <br />$29,888.95 <br />C[RCES Cost Estimating Software <br />