Laserfiche WebLink
Pagel of 2 <br />BULLDOZER WORK <br />Task description: Grade highwall side of ramp <br />Permit Action: Phase II /III Bond <br />Release SL -12 and <br />Site: New Horizon Mine PR -6 Permit/Job #: C1981008 <br />PROJECT IDENTIFICATION <br />Task #: 008 State: <br />Date: 10/21/2011 County: <br />User: SLB <br />Colorado <br />Montrose <br />Abbreviation: None <br />Filename: C008 -008 <br />Agency or organization name: Colorado Division of Reclamation, Mining and Safety <br />HOURLY EQUIPMENT COST <br />Basic Machine: <br />Cat D9T - 9U <br />Horsepower: <br />405 <br />Blade Type: <br />Universal <br />Attachment: <br />NA <br />Shift Basis: <br />1 per day <br />Data Source: <br />(CRG) <br />Cost Breakdown: <br />Utilization % <br />Ownership Cost/Hour: $72.40 NA <br />Operating Cost/Hour: $140.68 100 <br />Ripper op. Cost/Hour: $0.00 0 <br />Operator Cost/Hour: $38.49 NA <br />Total unit Cost/Hour: $251.56 <br />Total Fleet Cost/Hour: $503.12 <br />MATERIAL QUANTITIES <br />Initial Volume: <br />5,150 <br />Swell factor: <br />1.000 <br />Loose volume: <br />5.150 LCY <br />Source of estimated volume: Map 3.02.2 -5 <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly production: <br />100 feet <br />1,308.1 LCY /hr <br />Materials consistency description: Partly consolidated stockpile 1.1 <br />Average push gradient: <br />Average site altitude: <br />Material weight: <br />-20% <br />5.700 feet <br />2,900 lbs /LCY <br />Weight description: Decomposed rock - 50% Rock, 50% Earth <br />Job Condition Correction Factor Source <br />Operator Skill: 0.750 (AVG.) <br />CIRCES Cost Estimating Software <br />