My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-11-22_REVISION - C1981008
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981008
>
2011-11-22_REVISION - C1981008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:45:17 PM
Creation date
4/3/2012 11:12:41 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981008
IBM Index Class Name
Revision
Doc Date
11/22/2011
Doc Name
Reclamation Cost Estimate (Emailed)
From
Susan Burgmaier
To
Marcia Talvitie
Type & Sequence
SL12
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
148
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Truck/Loader Worksheet Cont'd Task # 05C Page 3 of 3 <br />l 1plAl <br />Seg # <br />. <br />Haul Distance <br />Grade ( %) <br />Roll. Res <br />Total Res <br />Velocity <br />Travel <br />(Ft) <br />Production <br />(%) <br />(%) <br />(fpm) <br />Time <br />199.79 LCY/Hour Adjusted for job efficiency: <br />165.82 LCY/Hour <br />Optimal No. of Trucks: <br />5 Truck(s) Selected Number of Trucks: <br />min <br />1 <br />4000.00 <br />-1.30 <br />3.00 <br />1.70 <br />3448 <br />1.655 <br />2 <br />10000.00 <br />-1.30 <br />1 3.00 <br />1 1.70 <br />3448 <br />2.900 <br />Haul Time: <br />4.555 <br />minutes <br />1.Gi1{1111 1.V <br />Seg # <br />uV. <br />Haul Distance <br />Grade ( %) <br />Roll. Res <br />Total Res <br />Velocity <br />Travel <br />(Ft) <br />Production <br />( %) <br />( %) <br />(fpm) <br />Time <br />199.79 LCY/Hour Adjusted for job efficiency: <br />165.82 LCY/Hour <br />Optimal No. of Trucks: <br />5 Truck(s) Selected Number of Trucks: <br />min <br />1 <br />10000.00 <br />1.30 <br />3.00 <br />4.30 <br />3540 <br />3.087 <br />2 <br />4000.00 <br />1.30 <br />3.00 <br />4.30 <br />3540 <br />1.130 <br />JOB TIME AND COST <br />Fleet size: 1 Team(s) <br />Unit cost: $1.538 /LCY <br />Total job time: 139.68 Hours <br />Total job cost: $142,540.99 <br />CIRCES Cost Estimating Software <br />Return Time: 4.217 <br />minutes <br />Total Truck Cycle Time: 12.157 <br />minutes <br />Loading Tool unit <br />Production <br />1,062.93 LCY/Hour Adjusted for job efficiency: <br />882.23 LCY/Hour <br />Truck Unit Production <br />199.79 LCY/Hour Adjusted for job efficiency: <br />165.82 LCY/Hour <br />Optimal No. of Trucks: <br />5 Truck(s) Selected Number of Trucks: <br />4 Truck(s) <br />Adjusted hourly truck team production: 663.29 <br />LCY /Hour <br />Adjusted single truck/loader team production: 663.29 <br />LCY/Hour <br />Adjusted multiple truck/loader team production: 663.29 <br />LCY/Hour <br />JOB TIME AND COST <br />Fleet size: 1 Team(s) <br />Unit cost: $1.538 /LCY <br />Total job time: 139.68 Hours <br />Total job cost: $142,540.99 <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.