Laserfiche WebLink
oe OFFI C CE OF SURFACE MINING <br />VI- ' ,Mine Site Evaluation <br />, <br />t y State Program <br />1. Permittee/Person Uw cog a �s <br />NEW ELK COAL COMPANY, LLC <br />i . "1 N OFT <br />o �P <br />F S UR FAC <br />2. Address <br />1122 W 1ST ST <br />3. City <br />'TRINIDAD <br />5. Zip Code <br />181082 <br />8. Mine Name <br />6. Phone Number <br />1(719) 845 <br />7. Operator Name, if Different than Permittee <br />4. State <br />1co1 <br />'NEW ELK MINE <br />25. Hours <br />1 4.0 1 <br />1 16.0 <br />1 7.0 <br />1 3.0 <br />a. Permit Review <br />b. Site Visit Time <br />c. Travel Time <br />d. Report Writing <br />26. Signature Block <br />Signature. <br />Christine Belka, ID #182 <br />Date: <br />Printed Name' <br />13/21/2012 <br />Permit Type - Item 10 IP = Interim Program PP = Permanent Program NP = No Permit <br />Purpose Type Codes - Item 12 <br />Oxx...Oversight <br />Axx...Assistance <br />RFx Reclamation Fees <br />Fxx...Federal Actions <br />Permit Status - Item 14 <br />A Active' Coal mining activities occurring or permitted but not yet <br />disturbed. <br />IN Inactive (Permanent Program Permit): Phase II completed or <br />Temporary Cessation of Operations (Interim Program Permit): AB2 <br />Coal mining completed and reclamation activities initiated. <br />BR Bond Release: Reclamation completed and State Regulatory <br />Authority(RA) has released all of the bond (Phase III Release). <br />Site Status - Item 15 <br />ND No Disturbance: No coal mining and reclamation <br />operations have been started. <br />EX Coal Exploration' Coal exploration operations have <br />started and where coal mining operations have not <br />begun. <br />AP Active Coal Producing. Coal surface mining <br />activities are occurring. <br />AN Active Non-Producing' Active non - producing facility <br />such as tipple or preparation plant. <br />NM No Mining' The Permit Status is active, site is not in <br />Temporary Cessation, no surface coal mining <br />activity, and site not regraded. <br />MC <br />TC <br />P1 <br />P2 <br />P3 <br />13/7/2012 <br />mm - dd - yvey <br />14. Permit Status <br />I <br />17. OSM Office # <br />1141 <br />20. M.S.H.A. ID # <br />105 - 00296 <br />23. AVS Permittee <br />1103972 <br />Joint Inspection - Item 13 A joint Inspection is when a state inspector accompanies an OSM inspector at any time during the review of the mine site <br />Mining Complete* No mining activity on site, site <br />regraded and awaiting bond release <br />Temporary Cessation' The RA has granted <br />cessation of mining pursuant to 30 CFR <br />816/817:13(b). <br />Phase I Release: At least Phase I bond release <br />granted for entire permitted area. For interim <br />permits, partial bond release. <br />Phase II Release At least Phase II bond release <br />for the entire permitted area. <br />Phase III Release: Reclamation completed and <br />the RA has released all bond. <br />Facility Type Codes - Item 16 D.. Ancillary (Haulroad, Conveyor, and /or Rails H .Exploration Permits <br />A....Surface E ..Refuse and /or Impoundment I...Notice of Intent to Explore <br />B....Underground F.. Loading Facility and /or Tipple J ..,Exempt 16 and 2/3 <br />C. .Preparation Plant G....Stockpiles <br />9. Permit Number 10. Permit Type <br />IC- 012 -81 <br />� <br />11. Field Visit Date 12. Purpose <br />IOC <br />13. SRA Present <br />I <br />15. Site Status 16. Facilit T <br />IAP I <br />BEF <br />18. CCID # 19. Land Code <br />CO <br />Entity ID Number <br />(S <br />21. State Abbrev. 22. Coun /Burrough <br />27. Reviewing Official: <br />24. State Office <br />y y, Signature: <br />Review Date: 6 ?ice 1 ?p 1 � <br />mm dmm d - <br />Is Supplemental MSE Page Used Y/N <br />CCR..Citizen Complaint Referral (non -site visit <br />CC ..Citizen Complaint (initial site visit) <br />CCF...Assistance <br />K ...Government Financed Construction Exemption <br />L...Remining site permitted under 30 CFR 785.25 <br />AB Abandoned' All surface and underground coal mining activities have ceased and operator <br />has left the site without completing reclamation as defined in 30 CFR 840:11(g). <br />AB1 Bond Forfeiture. Bond forfeiture officially in process or completed and reclamation in <br />progress or not yet commenced <br />Partially Reclaimed Forfeiture. Forfeited site where all bonds have been used to reclaim site, <br />but site not reclaimed to Program standards. <br />AB3 Reclaimed Forfeiture. Forfeited site that has been reclaimed to Program standards. <br />NA Not Applicable: When site is unpermitted. <br />NS Non -Site Visit. Status of site not determined. <br />Forfeiture Pending: The RA is pursuing actions to <br />FP revoke the permit, collect the performance bond(s), <br />and /or reclamation of forfeited site is in progress <br />FR Forfeited and Reclaimed: Forfeiture reclamation <br />completed. <br />FO Abandoned Site: Abandoned site that is permitted but <br />there is no bond. <br />WC Wildcat: Coal mining and reclamation operations have <br />or are taking place and the activity is not covered by <br />the required permits from the RA. <br />Small Business Regulatory Enforcement Fairness Act (SBREFA) <br />Your Comments are Important <br />The Small Business and Agnculture Regulatory Enforcement Ombudsman and 10 Regional Fairness Boards were established to receive comments from small businesses about Federal agency <br />enforcement actions The Ombudsman will annually evaluate the enforcement activites and rate each agency's responsiveness to small business If you are a small business (a business with 500 or <br />fewer employees including those of affiliates) and wish to comment on the enforcement or compliance activities of OSM, call 1- 888 -REG -FAIR (1- 888- 734 -3247) <br />Page 1 <br />