Laserfiche WebLink
• <br />U.S. DEPT. OF THE INTERIO *ECEIVED <br />OFFICE OF SURFACE MINING <br />MAR 292012 <br />Mine Site Evaluation <br />State Program <br />Divirion of Reclamation, <br />Mining and SAIPty <br />INEW ELK COAL COMPANY, LLC <br />1122 W 1ST STREET <br />3. City <br />I TRINIDAD <br />5. Zip Code <br />181082 <br />( <br />1. Permittee/Person <br />2. Address <br />8. Mine Name <br />6. Phone Number <br />1(719) 845 -0090 <br />7. Operator Name, if Different than Permittee <br />4. State <br />1 Co 1 <br />I LORENCITO CANYON <br />25. Hours <br />1 3.0 I <br />1 8.0 I <br />I 8.0 I <br />1 3.0 I <br />a. Permit Review <br />b. Site Visit Time <br />c. Travel Time <br />d. Report Writing <br />Purpose Type Codes - Item 12 <br />Oxx..Oversight <br />Axx...Assistance <br />Site Status - Item 15 <br />ND No Disturbance: No coal mining and reclamation <br />operations have been started. <br />EX Coal Exploration. Coal exploration operations have <br />started and where coal mining operations have not <br />begun <br />AP Active Coal Producing' Coal surface mining <br />activities are occurring. <br />AN Active Non-Producing Active non - producing facility <br />such as tipple or preparation plant. <br />NM No Mining The Permit Status is active, site is not in <br />Temporary Cessation, no surface coal mining <br />activity, and site not regraded <br />26. Signature Block <br />Date: <br />Signatures <br />Christine Belka, ID #182 <br />Printed Name: <br />Permit Type - Item 10 IP = Interim Program PP = Permanent Program NP = No Permit <br />RFx. Reclamation Fees <br />Fxx .Federal Actions <br />13/21/2012 <br />9. Permit Number <br />1C- 084 -96 <br />11. Field Visit Date 12. Purpose <br />13/6/2012 <br />- dd - yyyy <br />IIN 1 <br />1141 <br />MC Mining Complete' No mining activity on site, site <br />regraded and awaiting bond release. <br />TC Temporary Cessation: The RA has granted <br />cessation of mining pursuant to 30 CFR <br />816/817:13(b) <br />P1 Phase I Release: At least Phase I bond release <br />granted for entire permitted area. For interim <br />permits, partial bond release <br />P2 Phase II Release: At least Phase II bond release <br />for the entire permitted area. <br />P3 Phase III Release: Reclamation completed and <br />the RA has released all bond <br />Facility Type Codes - Item 16 D....Ancillary (Haulroad, Conveyor, and /or Rails H ..Exploration Permits <br />A ..Surface E....Refuse and /or Impoundment I. .Notice of Intent to Explore <br />B....Underground F... Loading Facility and /or Tipple J.. ,Exempt 16 and 2/3 <br />C....Preparation Plant G....Stockpiles <br />NS <br />FP <br />FR <br />FO <br />WC <br />1oc <br />14. Permit Status 15. Site Status <br />'Pi <br />17. OSM Office # 18. CCID # <br />CO <br />IPP I <br />Y <br />IS <br />( <br />20. M.S.H.A. ID # 21. State Abbrev. 22. Coun <br />27. Reviewing Official: <br />10. Permit Type <br />13. SRA Present <br />16. Facili T <br />AH <br />19. Land Code <br />23. AVS Permittee Entity ID Number 24. State Office <br />1 <br />Review Date: 21 <br />m ddm dd - <br />Is Supplemental MSE Page Used Y/N <br />CCR..Citizen Complaint Referral (non -site visit <br />CC Citizen Complaint (initial site visit) <br />CCF Assistance <br />Ell <br />Joint Inspection - Item 13 A Joint inspection is when a state Inspector accompanies an OSM inspector at any time during the review of the mine site <br />Permit Status - Item 14 AB Abandoned: All surface and underground coal mining activities have ceased and operator <br />A Active: Coal mining activities occurring or permitted but not yet has left the site without completing reclamation as defined in 30 CFR 840:11(g). <br />disturbed. AB1 Bond Forfeiture Bond forfeiture officially in process or completed and reclamation in <br />IN Inactive (Permanent Program Permit): Phase II completed or progress or not yet commenced. <br />Temporary Cessation of Operations. (Interim Program Permit): AB2 Partially Reclaimed Forfeiture: Forfeited site where all bonds have been used to reclaim site, <br />Coal mining completed and reclamation activities initiated. but site not reclaimed to Program standards. <br />BR Bond Release: Reclamation completed and State Regulatory AB3 Reclaimed Forfeiture: Forfeited site that has been reclaimed to Program standards. <br />Authority(RA) has released all of the bond (Phase III Release). NA Not Applicable: When site Is unpermitted. <br />Non -Site Visit Status of site not determined. <br />Forfeiture Pending The RA is pursuing actions to <br />revoke the permit, collect the performance bond(s), <br />and /or reclamation of forfeited site Is in progress <br />Forfeited and Reclaimed. Forfeiture reclamation <br />completed. <br />Abandoned Site: Abandoned site that is permitted but <br />there is no bond. <br />Wildcat Coal mining and reclamation operations have <br />or are taking place and the activity is not covered by <br />the required permits from the RA. <br />K....Government Financed Construction Exemption <br />L Remining site permitted under 30 CFR 785 25 <br />Small Business Regulatory Enforcement Fairness Act (SBREFA) <br />Your Comments are Important <br />The Small Business and Agriculture Regulatory Enforcement Ombudsman and 10 Regional Fairness Boards were established to receive comments from small businesses about Federal agency <br />enforcement actions The Ombudsman will annually evaluate the enforcement activites and rate each agency's responsiveness to small business If you are a small business (a business with 500 or <br />fewer employees including those of affiliates) and wish to comment on the enforcement or compliance activities of OSM, call 1- 888 -REG -FAIR (1- 888 - 734 -3247) <br />Page 1 <br />