Laserfiche WebLink
PERMIT #: M- 2003 -091 <br />INSPECTOR'S INITIALS: PSH <br />INSPECTION DATE: March 20, 2012 <br />As required by the "Agreement to Modify Ditch and Ditch Easement" between Lafarge and the Smith and <br />Emmons Ditch Company, Martin Marietta was planning to relocate the ditch along the western boundary of <br />the site. The construction of the ditch is scheduled to be completed before the ditch is scheduled to be filled <br />on April 2, 2012. <br />No problems were noted during the inspection. <br />Inspection Contact Address <br />Mrs. Julie Mikulas <br />Martin Marietta Materials, Inc. <br />1800 N. Taft Hill Road <br />Fort Collins, CO 80521 <br />Page 3 of 4 <br />