Laserfiche WebLink
March 27, 2012 C- 1981 - 014 /Southfield Mine JHB <br />GENERAL MINE PLAN COMPLANCE: <br />The hydrology baseline section and PHC portion of the pen describe flows in Newlin Creek. Much of the flow <br />in Newlin Creek is diverted by the city of Florence and piped via the City of Florence waterline to the City of <br />Florence. What flow that does bypass the city waterline flows in Newlin Creek. The thick alluvium in the Newlin <br />creek drainage often diminishes the flow in the creek between the upstream monitoring point and the downstream <br />monitoring point. (Pen Section 2.05.63- Determining Probable Hydrologic consequences and page 2.05.6 -55) <br />SUBSIDENCE — Rule 4.20: <br />No surface expressions of subsidence were visible in the areas observed during this inspection. This inspection <br />focused on areas adjacent to Newlin Creek and Fremont county Road No. 15. <br />DOCUMENTS RECEIVED None <br />OTHER (SPECIFY) <br />Number of Partial Inspection this Fiscal Year: 6 <br />Number of Complete Inspections this Fiscal Year: 3 <br />Page 4 of 6 <br />