Laserfiche WebLink
The Pittsburg & Midway Coal Mining Co., Midway Mine, KS & MO <br />Design and construction of watershed features on 10,000 acres of mined land. Responsible for <br />modeling runoff and providing adequate hydrologic control structures to control erosion, <br />protect water quality and qualify for final reclamation bond release. <br />Union Pacific Railroad, Tennessee Pass Sulphuric Acid Spill Site, Leadville, CO <br />Designed and constructed a surface water runoff and erosion control plan for the area impacted <br />by the acid spill. <br />Union Pacific Railroad, Green River, WY <br />Performed soil inventory, vegetation survey, and Revised Universal Soil Loss Equation <br />hydrologic stability characterization on a trona waste dump facility for site closure purposes. <br />REVEGETATION SUCCESS EVALUATIONS & MONITORING PLANS <br />VEGETATION MANAGEMENT <br />c- Habitat < .. Management, Inc. <br />35 E Phillips Circle. Centel) niaL Colorado 8(l 123 <br />Developed and supervised the implementation of plans to evaluate revegetation success on a <br />variety of coal, hard rock, and quarry mining sites and other drastically disturbed lands. <br />Specialized in evaluating existing vegetation and developing management plans to meet <br />revegetation success goals and standards for large disturbance areas including mine sites, leach <br />pads, facility sites and hazardous waste spill sites. Developed and coordinated the collection of <br />vegetation data required for release of reclamation liability bonds on large acreages of <br />reclaimed coal and hard rock mines, and waste impacted sites. <br />Triton Coal Company, Buckskin Mine, Gillette, WY. <br />Reclamation Bond and Sediment Control Release Application- Performed Soil Inventory, <br />Vegetation Survey and Hydrologic Characterization and preparation of a bond release <br />application package. <br />Managed reclaimed vegetation communities through livestock grazing, controlled burns and <br />integrated pest management plans. Evaluated pre -burn and post -burn vegetation, soil, and site <br />stability parameters to develop burn sequence, fertility amendments, weed control and erosion <br />control practices. Developed and implemented high intensity rotational grazing livestock <br />programs and integrated pest management plans. <br />The Pittsburg & Midway Coal Mining Company, Empire & Midway Mines, KS & MO. <br />Planned and implemented the collection of pre- and post -burn vegetation, soil, and site stability <br />parameters to develop burn sequence, fertility amendments, weed control, and erosion control <br />on 10,000 acre Midway Mine and the 3,600 acre Empire Mine. Coordinated burn sequence with <br />grazing, vegetation monitoring, and other land management activities. Implemented a high <br />intensity, rotational grazing program on a combination of cool and warm season plant species <br />pastures. Grazing management resulted in improved vegetation growth and diversity while <br />reducing post -mine management costs. <br />Page 5 of 6 <br />