Laserfiche WebLink
Page 2 of 7 <br />EXHIBIT B - Site Description (Rule 6.3.2(b)): You must address Item (b) to the extent necessary to <br />demonstrate compliance with the applicable performance standard requirements of Rule 3. At a minimum, <br />you must identify any permanent man -made structures within two hundred (200) feet of the affected area <br />and the owner of each structure. Permanent man-made structures include houses, barns, fences, above or <br />below ground utilities, irrigation ditches, maintained or public roads, bridges, wells, pipelines, water storage <br />impoundments, railroad tracks, cemeteries, and communication antennas, etc. Each structure should be <br />located on Exhibit E - Map; Adequate as submitted <br />EXHIBIT B - Site Description (Rule 6.3.2(c)): You must address Item (c) to the extent necessary to <br />demonstrate compliance with the applicable performance standard requirements of Rule 3. At a minimum, <br />you must give a description of the water resources in the area of the proposed operation. Identify any <br />streams, springs, lakes, stock water ponds, ditches, reservoirs, and aquifers which would receive drainage <br />directly from the affected area. Provide any information available from publications or monitoring data on <br />flow rates, water table elevations and water quality conditions. Adequate as submitted <br />EXHIBIT C - Minna Plan (Rule 6.3.3): (1) The purpose of the mining plan is to describe how mining <br />will affect the permit area for the duration of the operation. This plan must be correlated to Exhibit E - Map. <br />The description of the mining plan must be adequate to satisfy the requirements of Section 3.1 and <br />demonstrate compliance with Rule 3. At a minimum, you must include the following information: Exhibit <br />C Adequate as submitted <br />(a) specify the estimated dates that mining will commence and end; <br />(b) give the estimated depth to which soil, suitable as a plant growth medium, will be salvaged for use in <br />the reclamation process. This description must be consistent with information provided in Exhibit B. <br />Sufficient soil must be salvaged to meet the vegetation establishment criteria of Subsection 3.1.10. If <br />plant growth medium is not reapplied on a graded area immediately after salvage, then you must specify <br />how the topsoil will be stockpiled and stabilized with a vegetative cover until used in reclamation. Plant <br />growth medium stockpiles must be located separate from other stockpiles, out of the way of mine traffic <br />and out of stream channels or drainage -ways. The location of plant growth medium stockpiles must be <br />shown on Exhibit E - Map; <br />(c) specify the thickness of overburden or quantity of waste rock, if any, to be removed to reach the deposit. <br />The location of any overburden stockpiles or waste rock fills must be shown on Exhibit E - Map; <br />(d) specify the thickness of the deposit to be mined; <br />(e) describe the major components of the mining operation such as: roads and access routes, pit, office, <br />shop /maintenance buildings, plant, processing facilities, and any underground openings such as adits or <br />ventilation facilities. These components must be located on Exhibit E - Map; <br />(f) specify the dimensions of any significant disturbances to the land surface such as pit excavations, mine <br />benches, impoundments, stockpiles, waste rock disposal areas, etc; <br />(g) specify the dimensions of any existing or proposed roads that will be used for the mining operation. <br />Describe any improvements necessary on existing roads and the specifications to be used in the <br />construction of new roads. New or improved roads must be included as part of the permitted acreage. <br />Describe any associated drainage and runoff conveyance structures to include sufficient information to <br />evaluate structure sizing; <br />(h) specify how much water will be used in conjunction with the operation, and the source of this water; <br />