My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-03-23_REPORT - M1988112
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1988112
>
2012-03-23_REPORT - M1988112
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:55:28 PM
Creation date
3/26/2012 2:16:05 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
REPORT
Doc Date
3/23/2012
Doc Name
ANNUAL FEE/ REPORT
From
BATTLE MOUNTAIN RESOURCES
To
DRMS
Email Name
WHE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Area <br />Remaining <br />Reclamation <br />(Acres) <br />West Pit <br />28.7 <br />Tailing Facility <br />Storage Pond <br />22.6 <br />Topsoil Stockpiles <br />5.5 <br />Road around Tailing <br />Facility and <br />Collection Pond <br />4 <br />Tailing Facility <br />Perimeter Road <br />12.9 <br />Waste Rock C Access <br />Road <br />3.7 <br />Pink Gneiss Pit Haul <br />Road <br />3.8 <br />Tailing Facility <br />Under -drain <br />Collection Pond <br />5 <br />Wells, Lysimeters, <br />and Piezometers <br />76 <br />Water Tank <br />1 <br />Total Area <br />86.2 <br />San Luis Project <br />CDRMS Annual Report <br />March 22, 2012 <br />Page 2 <br />on -going West Pit water management system including the treatment plant operation, the <br />tailing facility water management; access roadway reclamation of the West Pit and tailing <br />disposal area roadways; tailing facility under -drain collection pond and remaining topsoil <br />stockpile storage area reclamation. <br />Table 1 — Remaining San Luis Project Mine Disturbance <br />Lysimeters were inspected monthly and reported to the Division. The lysimeters <br />remained dry throughout the year. <br />Ground water sampling and analysis of the San Luis town and Shalom Ranch wells were <br />conducted in accordance with the applicable technical revision monitoring plan. <br />Laboratory analytical reports were distributed to the Division upon receipt from the <br />laboratory. <br />
The URL can be used to link to this page
Your browser does not support the video tag.