Laserfiche WebLink
leveled and recontoured and the stockpiled topsoil was replaced and spread. <br />The disturbed areas were then reseeded. <br />3. List any additional changes to the original prospecting and reclamation plan or <br />any unexpected problems (such as unexpected water or artesian conditions <br />encountered). (Attach additional pages, if needed.) <br />None <br />4. When do you expect to complete all exploration and reclamation activities for <br />this project? <br />All are completed <br />5. Does the prospector wish this report to be considered confidential? See Rule <br />If yes, attach a justification for the request. <br />2.02.7(2). No <br />6. Additional Comments: <br />None <br />Date: 5 7 ( Abf 7— <br />S'gnatur <br />of Authorized Representative <br />eabo•y Sage Creek Mining, LLC <br />Company <br />