Laserfiche WebLink
C-2010-089 <br />New Horizon North Mine <br />PARNos. 1- 1A -1B, 2-2A-2B1, <br />Page 5 of 60 <br />A statement has been added to 2.03.7(3) stating that no mining will occur within 300 feet of <br />an occupied dwelling. Item resolved in 31t 1y -2011 response. <br />2.03.8 - Permit Term Information <br />I . Information presented in this section of the permit is contradictory to that presented <br />elsewhere in the application regarding the proposed commencement and completion of <br />mining activities at NHN. Please revise the text of section 2.03.8 to be consistent with the <br />schedule and acreage described elsewhere in the permit application. Itern reso&ed in Aky- <br />2011 response% <br />2.03.9 — Personal Injury and Property Damage Insurance Information <br />1. The insurance certificate, in Attachment 2:03.9 -1, has not yet been provided. An insurance <br />certificate meeting the requirements of Section 2.03.9 must be submitted to the Division <br />prior to issuance of the permit. Itent resolved in Alay-2011 response. <br />2.03.10 — Identification of Other Licenses and Permits <br />1. The formatting of the inforniation provided in this section is confusing. It appears that the <br />applicant may have intended to break out the permits into Federal, State and Local agencies. <br />a) Please review the format of the information provided, and revise as appropriate to bring <br />clarity. Irene resole edin.illft�l, -20]lre.vl,)oiise. <br />b) WFC niust have all nee escary perntits in place bqfi)re disturbance can be initiatecl <br />2. Federal Licenses and Permits <br />a) The E.P.A. and NPDES permit are both listed on page 11, under Federal permits. This <br />would seem to be incorrect, as discharge permits for Colorado are issued by the Water <br />Quality Control Division (WQCD) of the Colorado Department of Public Health and <br />Environment (CDPHE). Please review the list of Federal permits, and delete the EPA <br />and NPDES items from this list, as appropriate. Item resolved in 31ay-20.11 response. <br />b) The U.S. Army Corps of Engineers (USACOE) is not included in the list. The Division <br />believes that permits from the USACOE may be required for the haul road crossings of <br />the wetlands within the area to be mined and for the crossing of Tuttle Draw necessary <br />for the Equipment Corridor. Please incorporate any USACOE permits into the list <br />provided in section 2.03,10, Ire iti resolved iiiAft, -201]resl)onse. <br />3. State Licenses and Permits <br />a) For the Division of Reclamation, Mining and Safety (DBMS) permit, the NEN Mine <br />permit application number has been assigned. Please incorporate permit application <br />number C-2010-089 into the text. .1tent resolved in -11try-201.1 response. <br />b) The text lists a permit to store, transport and use explosives. In accordance with the <br />requirements of 2.03.10(2), please provide the name and address of the issuing authority <br />for permit number 65. <br />