Laserfiche WebLink
C -2010 -089 PARNos. 1- 1A -1B, 2- 2A -2B, 3 <br />New Horizon North Mine Page 43 of 60 <br />requirements of 2:05.3(5) and 4.06 are also intended to be addressed here please revise the <br />text to include these two sections, if appropriate. It rrr revolved in ee -20I response. <br />5. The 2.05.4(2)(d) Introduction explains that "a sufficient thickness of suitable backfilled <br />weathered overburden material is replaced as subsoil... and that a minimum of <br />approximately three to four feet of suitable plant growth material, including the available <br />topsoil, exists on the surface of all regraded lands..." The text does not appear to commit <br />the applicant to placement of any specific minimum thickness of topsoil in the upper portion <br />of the "suitable plant growth material ". Please revise this paragraph to be consistent with <br />any topsoil (and subsoil) replacement changes made in response to the Division's adequacy <br />items that follow. <br />t.� i �,iJ ,, t11 <br />"',1 .,. s . 1),", <br />6. The outline used for Section 2.05.4(2)(d) appears to emulate that used for the New Horizon <br />Mine permit. For clarity, please insert the header "Overburden 1 Spoil Handling Plan" in <br />front of the "New Horizon North Mine Overburden and Interburden Characteristics" <br />subsection on page 1. <br />The hecrcder° afar cicklecl as r°eque,we(l: It rrr resole =cart in ee -201I resimns ,. <br />7. The first paragraph on page 2 refers to "Appendix 6 -4. Volume A, 1993" of the New <br />Horizon Mine permit for a description of the interburden at NHN. This reference does not <br />appear to be applicable to the existing version of Permit No. C- 1981 -008 — New Horizon <br />Mine. Please include any referenced permit materials within the NHN application. <br />Tdre te,vi i�, as r-ei,i,5 d to i-el Ir iiistecrcl to x�`(,c Boor '. 04, f (;eolc��, . t rrr r so&e in Dec• -20.11 <br />response. <br />8. The first complete paragraph on page 3 describes the mine sequence, and states that, <br />"topsoil, subsoil, or mixed" soil will be removed first. The text which follows should be <br />modified to include the possibility that soil will be stockpiled. <br />Tl e lext i�,as, iiio diked as l „egitestc ?cI t rrr r as lr r iir 1 rcm2 l r°c =s°la rrse <br />9. In the sixth line of the first paragraph on page 3, please delete the words, "As described in <br />Small Area Exemptions ". Item i- esolved in Dec-201-1 r esImns , <br />