Laserfiche WebLink
C-2010-089 <br />New Horizon North Mine <br />PARNos. I-IA-IBI, 2-2A-2B, 3 <br />Page 34 of 60 <br />V <br />J <br />r <br />11,3N,$F <br />ii, o',A, sic <br />"h'a" "'1 6 h 'r «irk f Yf <br />V e <br />,v <br />6'sr"'e <br />f rI A" i <br />,Ss" <br />;d,v­;,,,,,;'i i <br />i) The certified pond cross sections in the Arcadis report in Appendix 2.05.3(4)-1 show <br />that the gates on the primary discharge pipe are on the inside of the pond embankment. <br />How does Western Fuels propose to open the discharge gates if the water level is well <br />above the gated valve? <br />d ,,z I "I" <br />1', A Al , of <br />V <br />f <br />f <br />In Appendix 2.05.3(4)-1, "ARCADIS Report on Sediment Control", it is stated on the <br />cross-sections for the three sediment ponds that 18 inch or larger cmp principle <br />spillways will be installed. However, Rule 4.05.9(14)(b) requires that a professional <br />engineer certify that the pond has been constructed as designed. Therefore, an exact <br />