My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-01-13_APPLICATION CORRESPONDENCE - C2010089 (2)
DRMS
>
Day Forward
>
Application Correspondence
>
Coal
>
C2010089
>
2012-01-13_APPLICATION CORRESPONDENCE - C2010089 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:47:25 PM
Creation date
3/23/2012 12:31:53 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2010089
IBM Index Class Name
Application Correspondence
Doc Date
1/13/2012
Doc Name
Preliminary Adequacy Review No. 3 (Emailed)
From
Marcia Talvitie
To
Murari Shrestha
Media Type
d
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C-2010-089 <br />New Horizon North Mine <br />PARNos. I-IA-IBI, 2-2A-2B, 3 <br />Page 34 of 60 <br />V <br />J <br />r <br />11,3N,$F <br />ii, o',A, sic <br />"h'a" "'1 6 h 'r «irk f Yf <br />V e <br />,v <br />6'sr"'e <br />f rI A" i <br />,Ss" <br />;d,v;,,,,,;'i i <br />i) The certified pond cross sections in the Arcadis report in Appendix 2.05.3(4)-1 show <br />that the gates on the primary discharge pipe are on the inside of the pond embankment. <br />How does Western Fuels propose to open the discharge gates if the water level is well <br />above the gated valve? <br />d ,,z I "I" <br />1', A Al , of <br />V <br />f <br />f <br />In Appendix 2.05.3(4)-1, "ARCADIS Report on Sediment Control", it is stated on the <br />cross-sections for the three sediment ponds that 18 inch or larger cmp principle <br />spillways will be installed. However, Rule 4.05.9(14)(b) requires that a professional <br />engineer certify that the pond has been constructed as designed. Therefore, an exact <br />
The URL can be used to link to this page
Your browser does not support the video tag.