Laserfiche WebLink
Mobilization Workshect Cont'd Task # 076 Page 2 of 2 <br />1"N R."IMIRESM <br />C [PC F.S Cost, F'stimating SAWATC <br />Non-Roadable <br />Roadable <br />Equipment <br />E <br />Haul Time (Hours): <br />_-2.92 <br />192 <br />Return Time (14ours): <br />2.92 <br />192 <br />Loading Time (Hours)- <br />1.50 <br />NA <br />Untoading Time (Hours): <br />1. t1 <br />NA <br />Subtotals: <br />--9.83 <br />5,83 <br />JOB TIME AND COST <br />Total job time: 17.67 Hours <br />Total job cost: S28,967.46 <br />C [PC F.S Cost, F'stimating SAWATC <br />