Demo Worksheet Cont'd
<br />Task # TTT
<br />Page 2 of 3
<br />Railroad Track
<br />11,900 LF'
<br />Railroad track - Ties and
<br />11,900.00
<br />LF
<br />W57
<br />$101,983.00
<br />track
<br />Ballast
<br />2644 CY
<br />Railroad track- llallast
<br />2,644.00
<br />CY
<br />$4.12
<br />$10,893_.28
<br />Stacker Conveyor
<br />180 LF
<br />Conveyor, elevated,
<br />180-00
<br />LF
<br />S42.26
<br />57,606.811
<br />including supports - 5 &
<br />W x 6 ft, H housing
<br />Radial Stacker
<br />160 LF
<br />Conveyor, elevated,
<br />-T-§-4-2.26—
<br />160-00
<br />$6,761,60
<br />Conveyor
<br />including supports - 5 ft
<br />W x �ft.H hoosin.
<br />Loading Conveyor
<br />570 LF
<br />Conveyor, elevated,
<br />570.00
<br />LF
<br />554.7I
<br />$28,90410
<br />including supports - 8 ft.
<br />W x 10 ft, H housing
<br />Reclaim Tunnel
<br />12'x330'x]2"
<br />Demo. and on-site
<br />15,840.00
<br />SF
<br />S3_54
<br />S56,07160
<br />(4)
<br />disposal in excavated
<br />pit, 12 in. thick - Max.
<br />200 ft. push
<br />- Escape Tube
<br />42" x 90 LF
<br />Pipe, corrugated metal
<br />Oom
<br />LF
<br />$5.92
<br />$532.80
<br />(CMP) - 48 in. diameter
<br />pipe
<br />Coal Sampling
<br />8", Wx8'
<br />Bldg. (SN) demo./on-
<br />1,280,00
<br />CF
<br />SOA7
<br />$218.98
<br />Building
<br />site disposal in
<br />excavated pit - Max. 200
<br />ft. us It
<br />- Floor
<br />8'x20'x6"
<br />Demo. and on-site
<br />160,00
<br />SF
<br />$1.61
<br />$2570
<br />disposal in excavated
<br />pit, 6 in. thick - Max,
<br />200 ft ush
<br />ShopfOffice Trailer
<br />8'x40'x8'
<br />Bldg. (SN) demo./on-
<br />2,560.00
<br />CF
<br />$0.17
<br />$437.76
<br />site disposal in
<br />excavated pit - Max. 200
<br />ft. push
<br />qlffC� Budding
<br />8'x20'x8'
<br />Bldg. (SN) demo./on-
<br />2,560,00
<br />CF
<br />$0A7
<br />$437.76
<br />site disposal in
<br />excavated pit - Max. 200
<br />ft', h
<br />Floor
<br />8'x20'xl2"
<br />Demo, and on-site
<br />160.00
<br />SF
<br />$122
<br />$515.20
<br />disposal in excavated
<br />pit, 12 in. thick - Max.
<br />200 ft. push
<br />Footing
<br />2'x3'x56 LF
<br />Demo. and on-site
<br />56A0
<br />LF
<br />$18,92
<br />S1,053 92
<br />disposal in existing pit,
<br />10 ft. x 3 ft. - Max. 200
<br />ft, push
<br />6,000 Gallon Fuel
<br />6,000 Gallons
<br />Comprehensive stora ge
<br />1.00
<br />EA
<br />55,845.80
<br />$5,845�55,845.$1)
<br />Tank
<br />tank removal, non-
<br />leaking - 6,000 to 8,000
<br />�tank
<br />Power Lines
<br />1,000 Lr
<br />_ja
<br />Powerline or utility line,
<br />t'000.00
<br />LF
<br />$5,23
<br />$5,228,00
<br />overhead, wood -
<br />Double or "H" pole
<br />- Transformer
<br />I EA
<br />Transformer Removal -
<br />I .00
<br />_EA
<br />$2,500.00
<br />$2,500,00
<br />Non-PCH
<br />18" Culvert Removal
<br />266 LF
<br />Pipe, corrugated metal
<br />2£_650—
<br />LF
<br />$2.34
<br />$622.44
<br />(CMP) - 18 in, diameter
<br />2ige
<br />24" Culvert e oval
<br />—
<br />1,110 LF
<br />Pipe, corrugated metal
<br />7 1 _IO-00
<br />LF
<br />$110
<br />$3,441,0111
<br />(CMP) - 24 in, diameter
<br />Pipe
<br />CIRCES
<br />Cost Estimating Software