Laserfiche WebLink
Demo Worksheet Cont'd <br />Task # TTT <br />Page 2 of 3 <br />Railroad Track <br />11,900 LF' <br />Railroad track - Ties and <br />11,900.00 <br />LF <br />W57 <br />$101,983.00 <br />track <br />Ballast <br />2644 CY <br />Railroad track- llallast <br />2,644.00 <br />CY <br />$4.12 <br />$10,893_.28 <br />Stacker Conveyor <br />180 LF <br />Conveyor, elevated, <br />180-00 <br />LF <br />S42.26 <br />57,606.811 <br />including supports - 5 & <br />W x 6 ft, H housing <br />Radial Stacker <br />160 LF <br />Conveyor, elevated, <br />-T-§-4-2.26— <br />160-00 <br />$6,761,60 <br />Conveyor <br />including supports - 5 ft <br />W x �ft.H hoosin. <br />Loading Conveyor <br />570 LF <br />Conveyor, elevated, <br />570.00 <br />LF <br />554.7I <br />$28,90410 <br />including supports - 8 ft. <br />W x 10 ft, H housing <br />Reclaim Tunnel <br />12'x330'x]2" <br />Demo. and on-site <br />15,840.00 <br />SF <br />S3_54 <br />S56,07160 <br />(4) <br />disposal in excavated <br />pit, 12 in. thick - Max. <br />200 ft. push <br />- Escape Tube <br />42" x 90 LF <br />Pipe, corrugated metal <br />Oom <br />LF <br />$5.92 <br />$532.80 <br />(CMP) - 48 in. diameter <br />pipe <br />Coal Sampling <br />8", Wx8' <br />Bldg. (SN) demo./on- <br />1,280,00 <br />CF <br />SOA7 <br />$218.98 <br />Building <br />site disposal in <br />excavated pit - Max. 200 <br />ft. us It <br />- Floor <br />8'x20'x6" <br />Demo. and on-site <br />160,00 <br />SF <br />$1.61 <br />$2570 <br />disposal in excavated <br />pit, 6 in. thick - Max, <br />200 ft ush <br />ShopfOffice Trailer <br />8'x40'x8' <br />Bldg. (SN) demo./on- <br />2,560.00 <br />CF <br />$0.17 <br />$437.76 <br />site disposal in <br />excavated pit - Max. 200 <br />ft. push <br />qlffC� Budding <br />8'x20'x8' <br />Bldg. (SN) demo./on- <br />2,560,00 <br />CF <br />$0A7 <br />$437.76 <br />site disposal in <br />excavated pit - Max. 200 <br />ft', h <br />Floor <br />8'x20'xl2" <br />Demo, and on-site <br />160.00 <br />SF <br />$122 <br />$515.20 <br />disposal in excavated <br />pit, 12 in. thick - Max. <br />200 ft. push <br />Footing <br />2'x3'x56 LF <br />Demo. and on-site <br />56A0 <br />LF <br />$18,92 <br />S1,053 92 <br />disposal in existing pit, <br />10 ft. x 3 ft. - Max. 200 <br />ft, push <br />6,000 Gallon Fuel <br />6,000 Gallons <br />Comprehensive stora ge <br />1.00 <br />EA <br />55,845.80 <br />$5,845�55,845.$1) <br />Tank <br />tank removal, non- <br />leaking - 6,000 to 8,000 <br />�tank <br />Power Lines <br />1,000 Lr <br />_ja <br />Powerline or utility line, <br />t'000.00 <br />LF <br />$5,23 <br />$5,228,00 <br />overhead, wood - <br />Double or "H" pole <br />- Transformer <br />I EA <br />Transformer Removal - <br />I .00 <br />_EA <br />$2,500.00 <br />$2,500,00 <br />Non-PCH <br />18" Culvert Removal <br />266 LF <br />Pipe, corrugated metal <br />2£_650— <br />LF <br />$2.34 <br />$622.44 <br />(CMP) - 18 in, diameter <br />2ige <br />24" Culvert e oval <br />— <br />1,110 LF <br />Pipe, corrugated metal <br />7 1 _IO-00 <br />LF <br />$110 <br />$3,441,0111 <br />(CMP) - 24 in, diameter <br />Pipe <br />CIRCES <br />Cost Estimating Software <br />