Laserfiche WebLink
Trtlewtoader Workshoet Contd <br />maintained 10 <br />nau, <br />(Ft) <br />Task # 056 Page 3 of 3 <br />Road Condition: FirIp,, smooth. rolling. dirt/it. surfaced. watctvd, <br />g � Mffl <br />CIRCES Cost Esfirwfiwig Software, <br />Haul Time: 0.422 minutes <br />Return Route: <br />Seg ## Haul Distance <br />Grade (11/0) Roll. Res <br />Total Res Velocity Travel <br />(Ft) <br />M <br />(%) (fpm) Time <br />(min) <br />1 90(l M <br />( .00 3.00 <br />3.00 2874 0.342 <br />Return Time: 0.342 minutes <br />Total Track Cycle Time: 3.265 minutes <br />Loading Tool unit <br />Production <br />293.65 <br />LCY/Hour Adjusted for job efficiency: 243.73 LCY/Hour <br />Truck Unit Production <br />152.99 <br />LCY/Hour Adjusted for job efficiency; 126.98 LC ` /hour <br />Optimal No. of Trucks: <br />2 <br />Truck(s) Selected Number of Trucks; 3 Truck(&) <br />Adjusted hourly truck team production.- 380.94 LCYMour <br />Adjusted single truck/loader team production! 243.73 LCY/Hour <br />Adjusted multiple trucklloader team produc tiow. 243.73 LCY/Hour <br />JOB TIME AND COST <br />Fleet size- <br />I <br />Team() Total job time- 27.23 Hours <br />Unit costa <br />$2.795 <br />ILLY' TotalJob cost: $18,553.29 <br />CIRCES Cost Esfirwfiwig Software, <br />