My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-01-23_APPLICATION CORRESPONDENCE - C2010088 (2)
DRMS
>
Day Forward
>
Application Correspondence
>
Coal
>
C2010088
>
2012-01-23_APPLICATION CORRESPONDENCE - C2010088 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:47:45 PM
Creation date
3/23/2012 9:57:21 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2010088
IBM Index Class Name
Application Correspondence
Doc Date
1/23/2012
Doc Name
Revised Cost Estimate (Emailed)
From
Jim Stark
To
Mike Boulay
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Truck/Loader Worksheet Cont'd <br />Task # 055 <br />Return Time: 0644+6 <br />Page 3 of 3 <br />Truck Travel Haul & Return) Time: <br />Road Condition- EjM s L)th rollin dirt/it <br />surfaced, watered, <br />maintained 3.0 <br />Loading Tool unit <br />Haul Route: <br />Production <br />29M5 <br />LCY /Hour Adjusted for job efficiency: <br />5eg # Haul Distance Grade (0/6) <br />Roll. Res - Total Rea <br />Velocity <br />Trav 9 <br />(Ft) <br />(0/0) { °��} <br />(fpm) <br />Time <br />11`9.27 _ LC Y /Hour <br />Optimal No. of Trucks: <br />2 <br />_. <br />I 1200.00 i <br />3.00 1.00_____L2824 <br />0329 <br />- LCY /f lour <br />Haul Time: <br />0.529 <br />minutes <br />Return Time: 0644+6 <br />minutes <br />Total Truck Cycle Time, 3,476 <br />minutes <br />Loading Tool unit <br />Production <br />29M5 <br />LCY /Hour Adjusted for job efficiency: <br />243.73 LCYrHour <br />Truck Unit Production <br />14330 <br />LLCY/Hour Adjusted for;job efficiency: <br />11`9.27 _ LC Y /Hour <br />Optimal No. of Trucks: <br />2 <br />Truck(s) Selected Number of Trucks: <br />3 Trucks <br />Adjusted hourly truck team production. 357.81 <br />_. <br />- LCY /f lour <br />Adjusted single trucklloader teach production: 143.73 <br />LCY /Hour' <br />Adjusted multiple truckiloader team production: 243.73 <br />LCY /Hour <br />JOB TIME AND COST <br />Fleet size: <br />1 <br />Team(s) Total job time: 22.16 <br />Hours <br />Unit cost. <br />$2.795 <br />/t_CY Total job cost: 515,094.213 <br />
The URL can be used to link to this page
Your browser does not support the video tag.