Laserfiche WebLink
Bulldozer Worksheet Cont'd <br />1 Htrzr(sj <br />Task # 050; Page 2 of <br />Job Condition Correction Factor <br />Total jab time: <br />Source <br />Operator Skill: <br />0.750 <br />(AV G.) <br />Material consistency: <br />0.900 <br />KA T HII)) <br />Dozing method: <br />I.000 <br />Visibility: <br />1.000 <br />AVG.) <br />Job efficiency: <br />0.830 <br />(1 SHIT IDAY) <br />Spoil pile: <br />I.000 <br />(DO -OC) <br />Push gradient: <br />1.0 <br />(CAT <br />Altitude; <br />L000 <br />(CAT HB) <br />Material Weight: <br />0.793 <br />(CAT HB) <br />Blade type: <br />1.000 <br />(PAT) <br />Net correction- 11:4443 <br />Adjusted unit production: 552.35 LCY /hr <br />Adjusted fret production: 552.35 LC`t'Ihr <br />9#1MYRTF513MMUTIM <br />Fleet size: <br />1 Htrzr(sj <br />Unit cast: <br />$0A00 /LCY <br />Total jab time: <br />5.27 Hours <br />Total job cast: <br />$1,16191 <br />CtRCES Cost Pstinwing Software <br />