My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-01-23_APPLICATION CORRESPONDENCE - C2010088 (2)
DRMS
>
Day Forward
>
Application Correspondence
>
Coal
>
C2010088
>
2012-01-23_APPLICATION CORRESPONDENCE - C2010088 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:47:45 PM
Creation date
3/23/2012 9:57:21 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2010088
IBM Index Class Name
Application Correspondence
Doc Date
1/23/2012
Doc Name
Revised Cost Estimate (Emailed)
From
Jim Stark
To
Mike Boulay
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bulldozer Worksheet Cont`d <br />Task 047 Page 2 oft <br />lob Condition Correction Factor <br />Source <br />Operator Skill: <br />0,750 <br />(AVG, <br />Material consistency: <br />4.900 <br />CAT HB)) <br />Dozing method:' <br />1.000 <br />(GEN.) <br />Visibility: <br />l A00 <br />,Fob efficiency: <br />4.534 <br />(l SHIFTiDAY) <br />Spoil pile. <br />1. <br />(DOC Z -CSC) <br />Push gradient: <br />1.044 <br />(CAT ElH) <br />Altitude. <br />1.000 <br />(CAI ) <br />Material Weight.- <br />0.793 <br />(CAT HB) <br />Blade type. <br />1.000 <br />(PAT) <br />Net correction: 4:4443 <br />Adjusted unit production. 552.35 LCY/ r <br />Adjusted fleet production; $52.35 LCY /hr <br />JOB TIME AND COST <br />Fleet size: 1 Dozer(s) <br />Unit cost: SOA00 /LCD'' <br />Total job time: 21.09 Hours <br />Total jots costa $42655-65 <br />GIV E wCosa Esti 4m Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.