Laserfiche WebLink
Bulldozer Worksheet Coat °d <br />Task. # 04 <br />Job Condition Correction Factor <br />Operator Skill: <br />0.750 <br />Material consistency. <br />0.900 <br />Dozing method: <br />1.000 <br />'risibility: <br />1.000 <br />Job efficiency: <br />0.830 <br />� l <br />Spoil pile: <br />l.(itl <br />Push gradient: <br />1.000 <br />Altitude: <br />I.00 ?; <br />Material Weight: <br />0.793 <br />Blade type: <br />1.000 <br />Net correction: 0A443 <br />Adjusted unit production: 552.35 L,C'Ytlirr <br />Adjusted fleet production. 552.35 LCY r <br />JOB TIME D <br />Meet size: 1 Dozer(s) <br />Unit cost: S0.400ILCY <br />Total joke time: 21.69 Hours <br />Total job cast: <br />fflo <br />CI CES Cost Bfimathig SoRwam <br />