Laserfiche WebLink
Bulldozer Worksheet Ctim d Task # 045 Page 2 of <br />Job Condition Correction Factor Source- <br />Operator Skill: 0,750 (A V .1 <br />Material consistency: <br />(1.900 <br />Dozing method: <br />L0100 <br />Visibility: <br />1.0100 <br />Job efficiency: <br />Ol830 <br />Spoil pile: <br />1.0100 <br />Push gradient: <br />1.00 <br />Altitude: <br />1.000 <br />matcrial, eight; <br />0093 <br />Blade type: <br />11000 <br />Met - correction. 0.4443 <br />Adjusted unit production 552.35 L Ylllr <br />.Adjusted fleet production: 552.35 L Y/l-ir <br />QB TIME I Off <br />Fleet size: 1 "Dozer(s <br />Unit cost: S0.40WLCY <br />Total job time: 21.09 Hours <br />Total job cost: $42455.6 a <br />am <br />CIRC C(At Fqtinrmfing Software <br />