My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-01-23_APPLICATION CORRESPONDENCE - C2010088 (2)
DRMS
>
Day Forward
>
Application Correspondence
>
Coal
>
C2010088
>
2012-01-23_APPLICATION CORRESPONDENCE - C2010088 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:47:45 PM
Creation date
3/23/2012 9:57:21 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2010088
IBM Index Class Name
Application Correspondence
Doc Date
1/23/2012
Doc Name
Revised Cost Estimate (Emailed)
From
Jim Stark
To
Mike Boulay
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
kTJ [$103 ► P <br />Iiisk disetiptiou: Finish 0i4de Di*rhed AtOas P66r to SiWing <br />Site. <br />PrultA Loadout Permit Actiow New Permit Periti0bb#. C201 088 <br />Task #: 040 State; Colorado Abbreviation. None <br />Date: 30-Aua: 11 County: Mesa Filename: C088-040 <br />User: JRS <br />Agency or orgarazation name: DRMS <br />I # ! i 0 k <br />Basic Machine, CAT 12H <br />mph <br />Horsepower: 140 <br />Ripper Attachment <br />30 <br />Shift Basis; I_ per <br />10.40 <br />feet <br />........ _day � <br />Data Source: (CRG) <br />Cost Breakdown: <br />RAO <br />feet <br />L2727 <br />acres/hour <br />Utilization % <br />Ownership Cost/Hour: <br />$18.09 <br />NA <br />Operating Cost/Hour: <br />$34.97 <br />too <br />Ripper Operating Cost/Hour: <br />$0.00 <br />Operator Cost(Hour: <br />$38.86 <br />NA <br />Total Unit Cost/Hour: <br />$91:92 <br />101' FAIN <br />Total Fleet Cost/Hour: $91.92 <br />Total Area to be graded or ripped., 21-50 acres <br />Source of estimated acreage: Map 15 <br />I - - <br />--me. • to 0 i ft <br />1.25 <br />mph <br />Finish <br />- <br />arading (0-2.5 Tph) - 125 <br />30 <br />degrees <br />10.40 <br />feet <br />2.00 <br />feet <br />RAO <br />feet <br />L2727 <br />acres/hour <br />Source <br />Altitude,A4j: 0�89 is <br />Job fAciency- O�85 (I shfd� mod)� <br />Nd Correction: 0,7565 multiplier <br />Site Altitude: 4500 feet <br />M= <br />Unit cost: $95Ai Per acre� <br />Total Job turte, 2:133 Hours <br />Total job cost; $2 053.010 <br />C IRCES Cost Fstiffiating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.