Laserfiche WebLink
- - I I It, k <br />Basic Machine: Cat D9R - 9S1.i (2005) Horsepower: 405 <br />Ripper Attachment: I -Shank Ripper Shift Basis: I per day <br />Data Source: (CRG) <br />1,R�:� <br />Total Fleet Cost/Hour: $226.27 <br />Seismic Velocity: <br />NA <br />Utilization % <br />Ownership Cost/Hour: <br />$58.82 <br />NA <br />Operating Cost/Hour: <br />$117.59 <br />100 <br />Ripper Operating Costfflour: <br />$11:117 <br />100 <br />Operator Cost/Hour: <br />$38,49 <br />NA <br />Total Unit Cost/Hour: <br />5226,27 <br />feet <br />Total Fleet Cost/Hour: $226.27 <br />Seismic Velocity: <br />NA <br />feet/second <br />Area: <br />Average Ripping Depth: <br />4.05 <br />mph <br />Average Ripping Width: <br />6.08 <br />degrees <br />Average Ripping Length: <br />200M <br />feet <br />Average Dozer Speed: <br />88;00 <br />feet <br />Average Maneuver Time: <br />0.25 <br />feet <br />Production per unit area: <br />O 664 <br />acres/hour <br />Job Condition Correction Factors <br />Unadjusted Hourly Unit Production,- <br />0.664 <br />Acres/hr <br />Site Altitude: <br />4,500 <br />feet <br />Altitude Adj -. <br />I M <br />(CAT HB) <br />Job Efficiency: <br />0.83 <br />(1 sWftJday) <br />Net Correction: <br />0.83 <br />multiplier <br />Adjusted Hourly Unit Production: <br />0.55 <br />Acres/hr <br />Adjusted Hourly Fleet Production: <br />0.55 <br />Acres/hr <br />