My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-03-13_REVISION - M1977443
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977443
>
2012-03-13_REVISION - M1977443
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:25:39 PM
Creation date
3/21/2012 3:35:43 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977443
IBM Index Class Name
REVISION
Doc Date
3/13/2012
Doc Name
APPROVAL LETTER
From
DRMS
To
HARDROCK SAND & GRAVEL
Type & Sequence
AM1
Email Name
DMC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BULLDOZER RIPPING WORK <br />Task description: Rip pit floor and access roads <br />Site: Moon Pit No 2 Permit Action: AM1 <br />PROJECT IDENTIFICATION <br />Task #: <br />Date: <br />User <br />02A <br />2/28/2012 <br />DMC <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: Cat D8T - 8U <br />Ripper Attachment: 3 -Shank Ripper <br />Cost Breakdown: <br />Ownership Cost/Hour: <br />Operating Cost/Hour: <br />Ripper Operating Cost/Hour: <br />Operator Cost/Hour. <br />Total Unit Cost/Hour: <br />State: Colorado <br />County: Moffat <br />$65.28 <br />$102.84 <br />$6.49 <br />$38.49 <br />$213.10 <br />Total Fleet Cost/Hour: $213.10 <br />MATERIAL QUANTITIES <br />Alternate Methods: <br />Seismic: NA Bank Volume: NA <br />Area: 3.00 acres Rip Depth (ft): 2.00 <br />Source of estimated quantity: Mine plan map / inspection observation <br />HOURLY PRODUCTION <br />Seismic: <br />Area: <br />Seismic Velocity: <br />Average Ripping Depth: <br />Average Ripping Width: <br />Average Ripping Length: <br />Average Dozer Speed: <br />Average Maneuver Time: <br />Production per unit area: <br />Job Condition Correction Factors <br />Unadjusted Hourly Unit Production: <br />Site Altitude: <br />Altitude Adj: <br />Job Efficiency: <br />Net Correction: <br />JOB TIME AND COST <br />Fleet size: 1 <br />Adjusted Hourly Unit Production: <br />Adjusted Hourly Fleet Production: <br />Grader(s) <br />Unit cost: $364.994 Per acre <br />Selected estimating method: Area <br />NA <br />2.56 <br />7.08 <br />100.00 <br />88.00 <br />0.25 <br />0.703 <br />0.703 <br />6,380 <br />1.00 <br />0.83 <br />0.83 <br />Horsepower: <br />Shift Basis: <br />Data Source: <br />Utilization % <br />NA <br />100 <br />100 <br />NA <br />0.58 Acres/hr <br />0.58 Acres/hr <br />Total job time: <br />Total job cost <br />Permit/Job#: M1977443 <br />Abbreviation: None <br />feet/second <br />mph <br />degrees <br />feet <br />feet <br />feet <br />acres/hour <br />Acres/hr <br />feet <br />(CAT HB) <br />(1 shift/day) <br />multiplier <br />Filename: M443 -02a <br />310 <br />1 per day <br />(CRG) <br />BCY NA <br />Volume: 9,680 BCY or CCY <br />5.14 Hours <br />$1,095.00 <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.