Laserfiche WebLink
Task <br />Description <br />Form <br />Used <br />Fleet <br />Size <br />Task <br />Hours <br />Cost <br />O l a <br />02a <br />03a <br />04a <br />05a <br />Highwall reduction and site grading <br />DOZER <br />5.19 <br />$1,037.49 <br />$1,095.00 <br />$1,082.56 <br />$7,465.60 <br />$1,966.00 <br />Rip pit floor and access roads <br />RIPPER <br />5.13 <br />Topsoil distribution <br />DOZER <br />5.42 <br />Revegetate affected area <br />REVEGE <br />8.00 <br />Mobilize reclamation crew /equipment <br />MOBILIZE, <br />3.33 <br />SUBTOTALS: <br />27.07 <br />$12,646.65 <br />Task description: <br />Site: Moon Pit No 2 <br />PROJECT IDENTIFICATION <br />Task #: 000 State: Colorado <br />Date: 2/28/2012 County: Moffat <br />User. DMC <br />Agency or organization name: DRMS <br />TASK LIST (DIRECT COSTS) <br />COST SUMMARY WORK <br />Permit Action: AM1 Permit/Job#: M1977443 <br />Abbreviation: None <br />Filename- M443 -000 <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT: <br />Liability insurance: 2.02 Total = $255.46 <br />Performance bond: 1.05 Total = $132.79 <br />Job superintendent: 13.53 Total = $802.33 <br />Profit: 10.00 Total = $1,264.67 <br />TOTAL 0 & P = $2,455.25 <br />CONTRACT AMOUNT (direct + 0 & P) = $15,101.90 <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT: <br />Financial warranty processing (legal/related costs): <br />Engineering work and/or contract/bid preparation: <br />Reclamation management and/or administration: <br />500.00 <br />0.00 <br />5.00 <br />Total = 500.00 <br />Total = $0.00 <br />$755.10 <br />CONTINGENCY: 0.00 Total = $0.00 <br />TOTAL INDIRECT COST = $3,710.35 <br />TOTAL BOND AMOUNT (direct + indirect) _ $16,357.00 <br />