Laserfiche WebLink
Non - Roadable <br />Equipment <br />Roadable <br />, ui • ment <br />0.33 <br />0.33 <br />0.33 <br />0.33 <br />0.50 <br />NA <br />0.50 <br />NA <br />1.67 <br />0.67 <br />Mobilization Worksheet Cont'd <br />Task # 05A Page 2 of 2 <br />EQUIPMENT HAUL DISTANCE and Time <br />Nearest Major City or Town within project area region: CRAIG <br />Total one -way travel distance: 15.00 miles <br />Average Travel Speed: 45.00 mph <br />Transportation Cycle Time: <br />Haul Time (Hours): <br />Return Time (Hours): <br />Loading Time (Hours): <br />Unloading Time (Hours): <br />Subtotals: <br />JOB TIME AND COST <br />Total Non - Roadable Mob/Demob Cost * <br />'* two round trips with haul rig: <br />Total Roadable Mob/Demob Cost ** <br />** one round trip, no haul rig: <br />Total job time: <br />$1,949.13 <br />$16.87 <br />Total job cost: $1,966.00 <br />3.33 Hours <br />