Laserfiche WebLink
June 2011 <br />2011 <br />Pond <br />Hillside <br />Total Dissolved Solids (mg /I) <br />3880 <br />3870 <br />Total Suspended Solids (mg /I) <br />7 <br />9 <br />Iron (mq /I) <br />0.6 <br />1.32 <br />1.96 <br />May 2011 <br />2011 <br />Pond <br />Hillside <br />Total Dissolved Solids (mg /I) <br />3140 <br />3750 <br />Total Suspended Solids (mg /I) <br />8 <br />13 <br />Iron (mg /I) <br />0.81 <br />1.22 <br />April 2011 <br />2011 <br />Pond <br />Hillside <br />Total Dissolved Solids (mg /I) <br />3120 <br />3400 <br />Total Suspended Solids (mg /I) <br />U <br />U <br />Iron (mg /I) <br />1.1 <br />1.8 <br />March 2011 <br />2011 <br />Pond <br />Hillside <br />Total Dissolved Solids (mg /I) <br />2940 <br />3310 <br />Total Suspended Solids (mg /I) <br />U <br />U <br />Iron (mg /I) <br />0.90 <br />1.70 <br />January 2011 <br />2011 <br />Pond <br />Hillside <br />Total Dissolved Solids (mg /I) <br />2830 <br />3190 <br />Total Suspended Solids mg /I) <br />U <br />U <br />Iron (mg /I) <br />0.98 <br />1.4 <br />February <br />2011 <br />Pond <br />Hillside <br />Total Dissolved Solids (mg /I) <br />3140 <br />3220 <br />Total Suspended Solids (mg /I) <br />U <br />5 <br />Iron (mg /I) <br />0.84 <br />1.96 <br />POND DISCHARGE <br />The following table presents monitoring results for the mine seepage discharge. <br />Water was diverted to the new treatment pond during the week of June 14 to June 21, <br />1999. On August 2, 1999 the new treatment pond was full and discharging. <br />Bear performed lab analysis on the flow from the spring (hillside) as well as the pond <br />outflow during the year. Following are the data. <br />-5- <br />