Laserfiche WebLink
Mr. Miguel Hamarat <br />March 9, 2012 <br />Page 4 <br />In summary, the results of our analysis indicate that the current configuration of the Ultimate <br />Canal system generally conforms to the original design criteria, with the exception of the <br />minor controlled and manageable spill thru the spillway structure at Station 93 +00. <br />If you have any questions, comments, or concerns or would like to discuss further the <br />configuration, operation, or performance of the Ultimate Canal system at the Henderson Mill, <br />please contact us at your earliest convenience. <br />Sincerely, <br />Michael Stonefelt, P.E. <br />W. W. Wheeler and Associates, Inc. <br />r. \1300 \1333 \1333.16 (ultimate canal)\ documents \12mar091.hamarat.asbuilt.docx <br />