My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-03-21_REVISION - M1977342
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977342
>
2012-03-21_REVISION - M1977342
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:19:04 PM
Creation date
3/21/2012 12:02:23 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977342
IBM Index Class Name
REVISION
Doc Date
3/21/2012
Doc Name
Submittal of Construction Certifications and As-Built Drawing for Ultimate Canal.
From
Climax Molybdenum
To
DRMS
Type & Sequence
TR4
Email Name
TAK
PSH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Miguel Hamarat <br />March 9, 2012 <br />Page 4 <br />In summary, the results of our analysis indicate that the current configuration of the Ultimate <br />Canal system generally conforms to the original design criteria, with the exception of the <br />minor controlled and manageable spill thru the spillway structure at Station 93 +00. <br />If you have any questions, comments, or concerns or would like to discuss further the <br />configuration, operation, or performance of the Ultimate Canal system at the Henderson Mill, <br />please contact us at your earliest convenience. <br />Sincerely, <br />Michael Stonefelt, P.E. <br />W. W. Wheeler and Associates, Inc. <br />r. \1300 \1333 \1333.16 (ultimate canal)\ documents \12mar091.hamarat.asbuilt.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.