Laserfiche WebLink
2.5 2011 Hydrological Data <br />Hydro- Engineering Inc.'s collation of the 2011 hydrological data for Trapper Mine is submitted as Section <br />2.5, following this discussion, and addresses: <br />a. Groundwater Sections 2.0 -3.6 <br />(1) Groundwater level figures and tables Appendix A <br />(2) Groundwater quality figures and tables Appendix B <br />(3) Piezometric surface maps for the major aquifers Maps 2 -1 thru 2 -3 <br />(4) Springs data Appendix B <br />b. Surface water Sections 4.0 -5.3 <br />(1) Surface -water quality figures and tables Appendix C <br />(2) Flow measurement figures Appendix C <br />(3) Flow vs TSS vs time figures Appendix C <br />(4) Conductivity vs flow vs time figures Appendix C <br />c. Observed impacts on the hydrologic systems Section 6.0 <br />Included with the 2011 Hydrology Report is an index sheet to keep the basic well data and aquifer <br />information available to the reader. This index is to be used as the reference and also a "bookmark" as <br />the section is reviewed. <br />2.6 Trends <br />Hydro- Engineering's Section 6.0 discusses the observed impacts on the hydrologic systems of Trapper <br />Mine. Eleven surface water monitoring sites experienced discharge during 2011, perhaps the most <br />recorded in one season. Peak flows occurred at most sites in late May; a warm period in April also <br />induced a few sites to flow at their peaks in association with snowmelt runoff. Heavy snow -pack during <br />the winter of 2010 -2011 resulted in a prolonged snowmelt event. Some higher elevation areas of the <br />minesite held significant snowpack until late May, however, the snow came off slowly and evenly resulting <br />in a fairly mellow spring melt. Hydro- Engineering's Section 6.0 discussion provides details concerning <br />2011 trends. Overall, Trapper continues to have little effect on the local hydrologic regime. <br />2.7 Spoil Spring Sampling (2011) <br />Trapper conducted spoil spring sampling throughout the permit area during 2011. Data from this <br />monitoring is presented in the 2011 Annual Hydrology Report Appendix B Table B -2. Spring and Seep <br />locations are shown on Map M52 in the mine permit. Only those springs with flows exceeding 5 gpm are <br />sampled for full suite analysis in accordance with the approved monitoring program. <br />2.8 WET Testing Results <br />In 2011, four NPDES outfalls had Acute WET tests performed as required by NPDES Permit CO- 0032115 <br />- sites 011, 017, 020 and 021. In all cases the discharges showed no acute toxicity to the test species. <br />Summaries for the tests conducted during 2011 are included in Appendix C of Section 2.5. In accordance <br />with our NPDES permit only those drainages that receive pit dewatering or spoil spring contributions are <br />required to undergo WET testing. <br />GCR 2/12 <br />M \ANNUALRP\DRMS11 RPT\ANNUAL HYDROLOGY RPTS <br />