Laserfiche WebLink
U C <br />k2.e,5 rv Lk- Q ud d, o Cam <br />I. LOCATION MAP: Attach a USGS 7.5 minute quad, or similar map of adequate scale, which locates the prospecting <br />site(s). <br />J. Are prospect sites (e.g., drill holes, trench locations, etc...) staked on the ground? Yes_ No <br />K. Specify the Land Management Agency, Address and Telephone Number: <br />11 a Fr? i ' E G2- <br />o )1-44L ) r, , d e. /� rvt 4riG <br />1 . R„c n cIL ( a <br />L. The prospector is required to document that the NOI has been sent to the BLM or the USFS. Processing of the NOI will <br />not begin until the prospector has submitted evidence acceptable to the Division that the NOI was sent to the BLM or <br />USFS. Check one: <br />Evidence of notification is attached to this NOI for BLM Land <br />Evidence of notification is attached to this NOI for USFS Land. <br />Other proof of notice is attached to this NOI <br />II. MAPS & DRAWINGS <br />3 (FORM 2 - Public filing) <br />Mrn -ris r)n ?()) 6_s -SGT <br />Accurate topographic base map showing the location of the proposed project must be submitted with this notice. The prospector <br />may submit a U.S.G.S. 7.5 minute quadrangle, or similar map of adequate scale that: <br />3. identifies the proposed prospecting site(s) or activity areas involving surface disturbance. Activity areas include all drill holes, <br />mud pits, excavations, trenches, adits, shafts, tunnels, rock dumps, stockpiles, impoundments and prospecting roads, and <br />4. includes sufficient detail to identify and locate known prospecting features and facilities that may be affected and those that <br />are not anticipated to be affected. This includes the location of all drill holes, mud pits, excavations, trenches, adits, shafts, <br />tunnels, rock dumps, stockpiles, impoundments and prospecting roads. Color photographs, adequately labeled (including <br />date, orientation and location), of the prospecting site may be used to fulfill this requirement if included with the NOI <br />submittal. 5 ee__ 2K\-11b <br />III PROJECT DESCRIPTION <br />7. Mineral(s) and /or Resource(s) being Investigated: CR vo, r i'z Te ) d.5 Per/ F) v elc <br />8. Estimated dates of commencement and completion: 1 <br />Commencement: A r r <br />' + I ) ' f J a0 , <br />Completion: J 1 ( Rif h 13 , <br />9. Amount of material to be extracted, moved or proposed to be moved: 4, 6 3r) ,/ <br />10. Identify the type or method of prospecting proposed and quantity (place an "X ") <br />Cuts _ Pits Trenches <br />hafts _ unnels _Adits III Declines <br />^ <br />it Drilling _ Fluid Drilling _ _Drilling & Blasting <br />5 <br />riz). m u <br />