My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-03-06_HYDROLOGY - M2001090
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M2001090
>
2012-03-06_HYDROLOGY - M2001090
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:54:45 PM
Creation date
3/16/2012 3:33:33 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2001090
IBM Index Class Name
HYDROLOGY
Doc Date
3/6/2012
Doc Name
SWSP
From
DWR
To
APPLEGATE GROUP
Email Name
DMC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
River Valley Resource Pit SWSP Page 2 of 8 <br />February 22, 2012 <br />Phase 1A. Phase 1A includes 14.5 acres of disturbed area as shown on Figure 2 (attached). <br />Groundwater was not previously exposed at this site. Alpine anticipates exposing groundwater in <br />the form of a dewatering trench. <br />In accordance with the letter dated April 30, 2010 (copy attached) from the Colorado <br />Division of Reclamation, Mining, and Safety ( "DRMS "), all sand and gravel mining operators <br />must comply with the requirements of the Colorado Reclamation Act and the Mineral Rules <br />and Regulations for the protection of water resources. The April 30, 2010 letter from DRMS <br />requires that you provide information to DRMS to demonstrate you can replace long term <br />injurious stream depletions that result from mining related exposure of ground water. <br />In accordance with approach no. 4, you have provided an affidavit dated December <br />13, 2011 that indicates that 1.38 cfs of the Suttle Ditch and 1.0 cfs of the Weiskopf Ditch <br />water are dedicated for use as sources of replacement water solely for this SWSP for as <br />long as there are depletions at this gravel pit site, or until such time as another replacement <br />source is obtained. A copy of this affidavit is attached to this letter. For the purpose of this <br />SWSP, this affidavit will be accepted for the dedication of the shares; however, if the State <br />Engineer determines that a different affidavit or dedication process is necessary to assure <br />proper dedication of the shares, additional information may be required prior to future <br />SWSP approvals. <br />Depletions <br />The anticipated net depletions for this SWSP are 10.49 acre -feet per year. This SWSP <br />anticipates that a total of 1 acre of water surface will be exposed at the site in the dewatering <br />trenches around the Phase 1A mined area. You have provided a monthly breakdown of the annual <br />depletions that include 1.94 acre -feet of net evaporative loss, 1.47 acre -feet of water lost with the <br />mined product (which represents 100,000 tons of mined product), 3.15 acre -feet of water used for <br />dust control, and 3.93 acre -feet used for irrigation purposes. The material will be mined below the <br />water table in a dewatered state and will not be washed; therefore, in accordance with the State <br />Engineer's General Guidelines for SWSPs for Sand and Gravel Pits, the assumed moisture <br />content is 2% by weight. <br />Water will be used to irrigate approximately 3.4 acres of berms around the Phase 1A area. <br />For the purposes of this SWSP, you assumed that pasture grass will be the vegetation planted on <br />the berms. The State CU model was used with the Modified Blaney - Criddle method and TR -21 <br />crop coefficients to estimate the irrigation water requirement for pasture grass in this area with the <br />climate data taken from the Steamboat Springs weather station over the 1911 to 2010 period. The <br />resulting average annual irrigation water requirement is approximately 1.16 acre -feet per acre. For <br />the 3.4 acres of berms, the total irrigation consumptive use is estimated to equal 3.93 acre -feet per <br />year (Table 3). <br />A stream depletion model was developed for the River Valley Resource Pit and the effects <br />of the delayed impacts are found on the attached Table 4. The aquifer characteristics used in the <br />• <br />
The URL can be used to link to this page
Your browser does not support the video tag.