Laserfiche WebLink
CONTENTS <br />1.0 STORMWATER MANAGEMENT PLAN CERTIFICATIONS 1 <br />2.0 INTRODUCTION 2 <br />3.0 SITE DESCRIPTION 2 <br />3.1 PROJECT NAME 2 <br />3.2 PROJECT OPERATOR 2 <br />3.3 SITE DESCRIPTION 3 <br />3.3.1 Property Location 3 <br />3.3.2 Nature of the Operation's Activity 3 <br />3.3.3 Proposed Sequence of Activities 3 <br />3.3.4 Area of Disturbance 3 <br />3.3.5 Soil Types and Estimated Runoff Coefficient 4 <br />3.3.6 Existing Vegetation 4 <br />3.3.7 Location and Description of Potential Pollutant Sources 4 <br />3.3.8 Location and Description of Allowable Non - Stormwater Discharges 5 <br />3.3.9 Names of Receiving Waters and Wetlands 6 <br />4.0 SITE MAP 6 <br />5.0 STORMWATER MANAGEMENT CONTROLS 7 <br />5.1 SWMP ADMINISTRATORS 7 <br />5.2 IDENTIFICATION OF POTENTIAL POLLUTION SOURCES 7 <br />5.3 BEST MANAGEMENT PRACTICES (BMPS) FOR STORMWATER POLLUTION PREVENTION 7 <br />5.3.1 Structural Practices for Erosion and Sediment Control 7 <br />Table 1. Potential Pollutant Sources and Proposed Best Management Practices (BMPs) 7 <br />5.3.2 Non - Structural Practices for Erosion and Sediment Control 11 <br />5.3.3 Phased BMP Implementation 13 <br />5.3.4 Materials Handling and Spill Prevention 15 <br />5.3.5 Dedicated Concrete or Asphalt Batch Plants 16 <br />5.3.6 Vehicle Tracking Control 16 <br />5.3.7 Waste Management and Disposal, Including Concrete Washout 16 <br />5.3.8 Groundwater and Stormwater Dewatering 17 <br />6.0 POST - MINING AND POST - PROCESSING FINAL STABILIZATION AND LONG TERM <br />STORMWATER MANAGEMENT 17 <br />7.0 CONSTRUCTION ACTIVITIES INSPECTIONS 17 <br />7.1 MINIMUM INSPECTION SCHEDULE 17 <br />7.2 POST -STORM EVENT INSPECTIONS AT TEMPORARY IDLE SITE 18 <br />7.3 INSPECTION AT COMPLETED SITES /AREAS 18 <br />7.4 WINTER CONDITIONS INSPECTIONS EXCLUSION 18 <br />7.5 INSPECTION REQUIREMENTS 18 <br />7.6 INSPECTION REPORTS 19 <br />8.0 PROPER OPERATION AND MAINTENANCE 19 <br />