Laserfiche WebLink
O <br />i c <br />N 59,000 <br />i�. <br />,a( <br />N 58,000 <br />N 57.000 \ j <br />s <br />\ O <br />417 11 <br />N 56,000 <br />i <br />v <br />is <br />N 55,000 <br />ti�aE . <br />N 54,000 <br />f; <br />i <br />1 <br />\ I C <br />• <br />f'" r <br />n® <br />DIE <br />Q j ` <br />TA 1 < ` <br />rE <br />r <br />i, <br />V� <br />i <br />fi <br />i <br />I l <br />I t <br />I <br />/�% / � {" 1� / /�i^ �� �J� 'I .I �i � Jai � •� / � y. 1 � \; � \ \J \ <br />1 ` <br />l 11 <br />� P <br />/I <br />11 <br />EXISTING GROUND TOPOGRAPHY WAS CREATED BY COMBINING THE FOLLOWING FILES <br />RECV FROM FORESIGHT WEST SURVEYING, INC.: <br />SQUAW GULCH BASE TORO - PHASE 1 -- REVISED.DWG (RECV MARCH 14, 2010) <br />SQUAW GULCH BASE TOPO - PHASE 2.DWC (RECV APRIL 24, 2010) <br />SQUAW GULCH BASE TORO - PHASE 3-DWG (RECV MAY 4, 2010) <br />CCV TOPO EXPANSION 12 -29 -10 NORTH AREA.DWG (RECV JANUARY 13, 2011) <br />CCV TOPO EXPANSION 01 -28 -11 SOUTH AREA.DWG (RECV .JANUARY 28, 2011) <br />SI-I67 TOPO 7- 07- 11.DWG (RECV JULY 11, 2011) <br />VLF2 TQPO EXPANSION 8- 05-- 11.DWG (RECV AUGUST 9, 2011) <br />09028- COMOSITE -TOPO MLE LIMITS.DWG (RECV MAY 28, 2010 FROM CC &V) <br />LEGEND: <br />EXISTING GROUND SURFACE CONTOUR AND EL. FEET <br />(AERIAL SURVEY) <br />J <br />K EXISTING GROUND SURFACE CONTOUR AND EL. FEET <br />(LAND SURVEY) <br />-- ' ULTIMATE STOCKPILE CONTOUR AND EL. FEET <br />-� ORE DEPTH ISOPACH CONTOUR AND EL, FEET <br />PROPOSED VLF SURFACE CONTOUR AND EL, FEET <br />z - ULTIMATE LIMITS OF SQUAW GULCH GEOMEMBRANE AND PERIMETER ROAD <br />LIMITS OF PSSA <br />L <br />ORE TOPOGRAPHY <br />00 0 400 800 FEET <br />NOTES: <br />1. ORE TOPOGRAPHY EXCLUDES HAUL ROADS AND LOB AREA. <br />2. ORE STACKED AT 1.6:1 ON UPSLOPES, 2.5:1 ABOVE PSSA <br />EMBANKMENT, AND 2:1 ABOVE THE MILL PLATFORM. <br />3. CURRENT MAXIMUM PLANNED ORE HEIGHT IS 700 FEET ABOVE <br />THE LINER SYSTEM, WITH PERMITTING TO 800 FEET. <br />i CdCE: <br />EXISTING GROUND TOPOGRAPHY WAS CREATED BY COMBINING THE FOLLOWING FILES <br />RECV FROM FORESIGHT WEST SURVEY;NG, INC.: <br />SQUAW GULCH BASE TORO - PHASE 1 - REVISED.DWG (RECV MARCH 14, 2010) <br />SQUAW GULCH BASE TORO - PHASE 2.DWG (RECV APRIL 24, 2010) <br />SQUAW GULCH BASE TORO - PHASE 3.DWG (RECV MAY 4, 2010) <br />CCV TORO EXPANSION 12 -29 -10 NORTH AREA.DWG (RECV JANUARY 13, 2011) <br />CCV TOPO EXPANSION 01 -28 -11 SOUTH AREA.DWG (RECV JANUARY 28, 2011) <br />SH67 TOPO '7 -07 -i L.DWG (RECV JULY 11, 2011) <br />VLF2 TORO EXPANSION 8- 05- 11.DWG (RECV AUGUST 9, 2011) <br />09028- COMOS17E -10PO MILE LIMITS.DWG (RECV MAY 28, 2010 FROM CC &V) <br />ORE DEPTH ISOPACH <br />400 0 400 800 FEET <br />14LO <br />