Laserfiche WebLink
History <br />Recreatio <br />Buffer Bndy. <br />Emergency <br />Spillway✓ <br />EMP -022 <br />3 Plan View <br />1" =100 ft (DSize) <br />Pond a receives <br />Runoff from <br />South Tributary <br />North tributaryis <br />�c bypassed around x <br />structure <br />Spillway Riser <br />between Ponds <br />i, <br />Pond b Receives Runoff <br />from South side <br />lN9 <br />i <br />i <br />Minimal Area <br />outside Historic - <br />Recreation Buffer'- - <br />9850 <br />Historic 9g <br />Recreation � 9900 rest 1 t ' <br />Buffer Bnd . - 1nom <br />From Basin PG Al <br />C2) EMP -021 <br />Plan View <br />1 " =100 ft (DSize) <br />Total Buffer 0 f <br />Encroachment Pond EMP_ -09a <br />7058 Cut <br />1.2 Acres 6506 fill <br />Net Shortage 552 <br />Capacity 2.8 AF <br />923 / 0 <br />�9 ✓ ^j <br />- Lower South Ditc <br />Flow from Basins <br />PG -B1 and PG -C1 <br />Historic i <br />Pond EMP -09b Recreation <br />2447clut y. <br />� 2993 fill Buffer Bndy. <br />Net Excess 543 <br />Capacity 1.6AF <br />ow from Basin PG -E1 <br />Pond EMP 09 ° <br />9317 Cut <br />Natural Channel <br />Net Excess 6476 Tributary Flow <br />Capacity 3.9 AF <br />ZA 0 <br />- — <br />EMP -009 Four Ponds, a, b, c, and d <br />Plan View <br />1 " =100 ft (DSize) <br />10120 <br />10080 <br />10040 <br />10000 <br />996 PROFILED, At.5 <br />9920 - <br />9880 North Ditch <br />into EMP -09b <br />North Ditch is <br />Primarily an <br />interceptor, <br />not a conveyance <br />channel <br />.. Follows Old - <br />bandonedgrade <br />South Ditch <br />into EMP -09a <br />Grade Ditch on <br />Inside of Existing <br />Roadway <br />10120 <br />10080 <br />10040 <br />10000 <br />9960 <br />9920 <br />9880 <br />Note: All but <br />Pond 009a will be eliminated <br />in 2017 and must be <br />reconstructed in 2018 when <br />backfill begins <br />k1�j <br />�9 <br />1419 <br />Pond EMP_ -09 d <br />4100 Cut <br />1500 fill <br />Net Excess 2600 <br />Capacity 1.7AF <br />Profile F, Sht. 5 Profile E <br />9840 <br />-� <br />3 <br />14% tYp) <br />At. 5 <br />� <br />�� <br />- PROFILE C Sht. S <br />9840 <br />980Qfl <br />r er <br />35 <br />�/ <br />3 52% (Avg) <br />10080 <br />9800 <br />-., <br />it) <br />Q0 0 <br />b o <br />co o <br />rr <br />o <br />I-, (Z) <br />co N <br />d N M to <br />10040 <br />10000 <br />DATUM 1s-LEV <br />976t ° <br />_ o a - -ar .' <br />°o °0 <br />- o- <br />. - `ai °cam <br />—°' -- <br />°v' -- <br />6 -- <br />dam- - -L- <br /><r <r <br />L6 c6 ri co <br />c`�o - -- <br />„k <br />-- <br />9 50. 00 <br />0 <br />0 0 <br />0 ao <br />ai <br />TmT ao <br />vJ Qi <br />rawo Co <br />ai <br />arto <br />()o <br />vJ <br />m cTow <br />vJ <br />CO m <br />ao rn rn a) <br />Qi <br />rtrnT <br />vJ <br />Q; N <br />M <br />n <br />n R n <br />eNa eoa �� 9920 <br />9900.00 0 0 <br />0 0 0 <br />0 <br />0 0 <br />0 <br />o rn <br />0+00(o) rn <br />M 00, rn <br />0 0 0 <br />0 0 0 0 <br />15 +00 10 +00 <br />5 +00 <br />0 +00 <br />5 +00 <br />10 +00 <br />15 +00 <br />20 +00 <br />25 +00 30 +00 35 +00 <br />0+00 5 +00 <br />PROFILES <br />6 <br />C & D - <br />Lower North Ditch <br />Cross <br />Country to <br />EMP -09 <br />and <br />Lower South Ditch <br />along Access Road <br />to EMP -009 <br />Profile View <br />Profile View <br />1" =500 ft (DSize) <br />1 " =500 ft (DSize) <br />EMP -21 <br />Note: All but <br />Pond 009a will be eliminated <br />in 2017 and must be <br />reconstructed in 2018 when <br />backfill begins <br />k1�j <br />�9 <br />1419 <br />Pond EMP_ -09 d <br />4100 Cut <br />1500 fill <br />Net Excess 2600 <br />Capacity 1.7AF <br />Profile F, Sht. 5 Profile E <br />Notes and General Specifications: <br />1. Ditches along access roads should generally be triangular cross - section to facilitate cleaning with a <br />road - grader. The dimensions of ditches are listed on Sheet 5, along with the expected armoring <br />requirements (3 "Riprap, 6" Riprap or vegetated channels). The freeboard is calculated to include a <br />minimum of 6- inches at the 100 year calculated discharge plus the velocity head depth. <br />2. EMP' Ponds and their embankments are intended to be water tight because of their proximity to high <br />walls of the mining areas and to the Historic Recreation Buffer Zone. Accordingly, they shall be <br />constructed to conform to the following general specifications: <br />a. Remove soils within the footprint of the pond area down to suitable non - organic soils with no less <br />than 15-20% fines ( <200 mesh). Proof roll the footprint and compact as needed to achieve a target <br />density of no less than 90% in the basin and no less than 95% Std. Proctor in the embankmant. <br />b. Select soils for the embankment that have at least 15% fines. Place and compact the embankment <br />soils in 8 -inch maximum loose layers and compact to at least 95% Std. Proctor density. <br />c. Maximum slope of embankment shall be 2 :1. Maximum slope inside sediment basin shall be 1.751. <br />Maximutrn slope of reseeded areas shall be 3:1. <br />3. An emergency spillway shall be constructed at each pond with a finished invert elevation <br />approximately 2.0 feet lower than the crest and abase width of 6.0 feet. The spillway shall be armored <br />with 6" angular norap place on 6- inches of sandy - gravel bedding and a layer of Mirifi drain fabric. <br />At. 5 <br />I 10120 <br />10120 <br />Area Graded <br />35 <br />10320 <br />10280 <br />3 52% (Avg) <br />10080 <br />to serve <br />-., <br />10080 <br />10040O_r <br />\ <br />10240 <br />10040 <br />10000 <br />8 >6, <br />50/0 <br />0.17% _ 10000 <br />996 <br />�0 <br />„k <br />9960 <br />r� <br />o M o <br />0 0 <br />0 <br />o <br />rn' o <br />DATUM F'Z,E V o <br />rn 000 <br />°m <br />Q; N <br />M <br />o - -�� <br />e°a <br />eNa eoa �� 9920 <br />9900.00 0 0 <br />0 0 0 <br />0 <br />0 0 <br />0 <br />o rn <br />0+00(o) rn <br />M 00, rn <br />0 0 0 <br />0 0 0 0 <br />30 +00 25 +00 <br />20 +00 15 +00 <br />10 +00 5 +00 <br />0+00 5 +00 <br />10 +00 <br />PROFILES E & F <br />5 <br />- Upper South <br />and <br />North <br />Ditches to EMP -21, to <br />replace EMP -08a in 2014 <br />Profile View <br />1 " =500 ft (DSize) <br />to <br />EMP08a <br />Profile View <br />1" =500 ft (DSize) <br />Notes and General Specifications: <br />1. Ditches along access roads should generally be triangular cross - section to facilitate cleaning with a <br />road - grader. The dimensions of ditches are listed on Sheet 5, along with the expected armoring <br />requirements (3 "Riprap, 6" Riprap or vegetated channels). The freeboard is calculated to include a <br />minimum of 6- inches at the 100 year calculated discharge plus the velocity head depth. <br />2. EMP' Ponds and their embankments are intended to be water tight because of their proximity to high <br />walls of the mining areas and to the Historic Recreation Buffer Zone. Accordingly, they shall be <br />constructed to conform to the following general specifications: <br />a. Remove soils within the footprint of the pond area down to suitable non - organic soils with no less <br />than 15-20% fines ( <200 mesh). Proof roll the footprint and compact as needed to achieve a target <br />density of no less than 90% in the basin and no less than 95% Std. Proctor in the embankmant. <br />b. Select soils for the embankment that have at least 15% fines. Place and compact the embankment <br />soils in 8 -inch maximum loose layers and compact to at least 95% Std. Proctor density. <br />c. Maximum slope of embankment shall be 2 :1. Maximum slope inside sediment basin shall be 1.751. <br />Maximutrn slope of reseeded areas shall be 3:1. <br />3. An emergency spillway shall be constructed at each pond with a finished invert elevation <br />approximately 2.0 feet lower than the crest and abase width of 6.0 feet. The spillway shall be armored <br />with 6" angular norap place on 6- inches of sandy - gravel bedding and a layer of Mirifi drain fabric. <br />EMP -08a <br />Low <br />Area Graded <br />10320 <br />10280 <br />3 52% (Avg) <br />to serve <br />as DetePond <br />\ <br />10240 <br />,,, - <br />Open Ditch -� <br />10200 <br />Graded on Existing <br />„k <br />10160 <br />r� <br />o Roadways o <br />0 0 <br />0 <br />o <br />rn' o <br />DATUM L;LEV <br />rn <br />(0� � <br />( <br />Q; N <br />ai <br />o <br />0 <br />ang <br />�� M <br />,I 10100.00 <br />� <br />0 N 0 N N N N <br />N N <br />N 0 <br />0 N <br />000 <br />(NZ) 0 <br />0 0 0 <br />0 0 0 0 <br />0 +00 <br />5 +00 10 +00 15 +00 <br />20 +00 <br />25 +00 <br />30 +00 <br />35 +00 40 +00 45 +00 <br />4 PROFILE G- <br />Poverty Gulch /Schist Island - <br />Upper Ditch <br />to <br />EMP08a <br />Profile View <br />1" =500 ft (DSize) <br />Notes and General Specifications: <br />1. Ditches along access roads should generally be triangular cross - section to facilitate cleaning with a <br />road - grader. The dimensions of ditches are listed on Sheet 5, along with the expected armoring <br />requirements (3 "Riprap, 6" Riprap or vegetated channels). The freeboard is calculated to include a <br />minimum of 6- inches at the 100 year calculated discharge plus the velocity head depth. <br />2. EMP' Ponds and their embankments are intended to be water tight because of their proximity to high <br />walls of the mining areas and to the Historic Recreation Buffer Zone. Accordingly, they shall be <br />constructed to conform to the following general specifications: <br />a. Remove soils within the footprint of the pond area down to suitable non - organic soils with no less <br />than 15-20% fines ( <200 mesh). Proof roll the footprint and compact as needed to achieve a target <br />density of no less than 90% in the basin and no less than 95% Std. Proctor in the embankmant. <br />b. Select soils for the embankment that have at least 15% fines. Place and compact the embankment <br />soils in 8 -inch maximum loose layers and compact to at least 95% Std. Proctor density. <br />c. Maximum slope of embankment shall be 2 :1. Maximum slope inside sediment basin shall be 1.751. <br />Maximutrn slope of reseeded areas shall be 3:1. <br />3. An emergency spillway shall be constructed at each pond with a finished invert elevation <br />approximately 2.0 feet lower than the crest and abase width of 6.0 feet. The spillway shall be armored <br />with 6" angular norap place on 6- inches of sandy - gravel bedding and a layer of Mirifi drain fabric. <br />