Laserfiche WebLink
Safety and maintenance of the means of transportation, and security and emergency <br />response during transportation is clearly the responsibility of TriMac pursuant to the <br />conditions of their contract with Cyanco. <br />2.2 Require that cyanide transporters implement appropriate emergency <br />response plans and capabilities, and employ adequate measures for cyanide <br />management. <br />The operation is: • in full compliance <br />❑ in substantial compliance <br />❑ not in compliance...with Standard of Practice 2.2. <br />Discuss the basis for the Finding/Deficiencies Identified: <br />Cyanco's contract with CC &V was modified in 2007 to require that the supplier and <br />transporter both be certified to the ICMC or undergo an ICMC - equivalent audit by a <br />third -party auditor. The latter option was in force in 2007, and an ICMC - equivalent <br />third -party audit was conducted for TriMac in November 2006. Although the current <br />version of the ICMC now requires that transporters be certified to the ICMC, the <br />language of 2007 contract adequately addresses this requirement of the Code since <br />TriMac has also recently been audited to the ICMC, and certification status has been <br />achieved. <br />Signed bills of lading demonstrating maintenance of custody by the shipper (TriMac) <br />from the point of origin to the Cresson Project are maintained on file. TriMac is the only <br />transporter. <br />3. HANDLING AND STORAGE Protect workers and the environment during <br />cyanide handling and storage. <br />Standards of Practice <br />3.1 Design and construct unloading, storage and mixing facilities consistent with <br />sound, accepted engineering practices and quality control and quality <br />assurance procedures, spill prevention and spill containment measures. <br />The operation is: • in full compliance <br />❑ in substantial compliance <br />❑ not in compliance...with Standard of Practice 3.1. <br />Discuss the basis for this Finding/Deficiencies Identified: <br />Cresson Project <br />Name of Mine <br />September 22, 2010 <br />Signature of Lead Auditor Date <br />Page 6 of 36 <br />