Laserfiche WebLink
drainage cover fill material. The leak detection and collection system within the PSSAs <br />are continuously monitored and pumped to ensure that less than two feet of hydraulic <br />head is placed on the lower synthetic liner. The entire VLF area is underlain by a leak <br />detection system placed on the graded and prepared subgrade prior to placement of the <br />soil liner. <br />A geomembrane liner connected to the VLF liner system underlies the entire ADR Plant <br />area, including the cyanide Offload and Storage Facility. The liner serves as tertiary <br />containment for the concrete secondary containment facilities provided at the offload and <br />plant. The cyanide Offload and Storage Facility, located adjacent to the ADR Plant <br />building, consists of a curbed, concrete loading apron for staging the delivery <br />trucks /trailers containing the ISO tanks. The concrete apron drains to the adjacent <br />concrete containment area occupying the Cyanide Mix Tank and the Cyanide Storage <br />Tank. <br />CC &V conducts regular inspections and monitoring of the process facilities to ensure that <br />the operating criteria are being met. In addition, regular monitoring of groundwater <br />downgradient of the operation and of leak detection and solution collection systems is <br />conducted to ensure that the facility is functioning as designed and protective of the <br />environment. <br />Groundwater is regulated by DRMS in accordance with the Mining and Reclamation <br />Permit. The regulatory numerical standard for cyanide in groundwater is 0.20 mg /1 WAD <br />cyanide and is based on five quarters of baseline data. CC &V monitors groundwater <br />quality at three compliance points downgradient of the operation and reports results <br />quarterly to DRMS. Quarterly groundwater monitoring data for the period 2007 through <br />2010 demonstrate that all numeric permit conditions were met over this period. There <br />has been no seepage from the operation that has caused indirect discharges to <br />groundwater; therefore, CC &V is not engaged in remedial activity. <br />4.7 Provide spill prevention or containment measures for process tanks and <br />pipelines. <br />The operation is: <br />• in full compliance <br />❑ in substantial compliance <br />❑ not in compliance...with Standard of Practice 4.7. <br />Discuss the basis for the Finding/Deficiencies Identified: <br />All cyanide storage and process tanks and process pipelines at the Cresson Project are <br />provided with adequately sized concrete and/or synthetic -lined secondary containment. <br />Nonetheless, CC &V has implemented written procedures for cleaning up spills, which <br />include measures for sampling fluid and/or soils after detoxification and removal for <br />confirmation testing. <br />Cresson Project <br />Name of Mine <br />September 22, 2010 <br />Signature of Lead Auditor Date <br />Page 17 of 36 <br />