Laserfiche WebLink
and multiple gas meters) are available either through Process personnel, Safety, or the Mine <br />Rescue Team. <br />VI. Notification <br />All notification should be done in accordance with the Emergency Response Procedures (ERP). <br />All contact information for both internal and external contacts can be found in the ERP under the <br />CONTACTS tab. <br />VII. Monitoring and Remediation <br />Releases to the Land <br />All releases of cyanide or cyanide solution to the land will be cleaned up as soon as practicable. <br />Spills of solid cyanide will be picked up by shovel such that all visible cyanide is recovered. <br />Releases of cyanide solution shall be recovered if practicable, treated in place and contaminated <br />soil shall be excavated. Ponded solution shall be recovered for use in the leaching process if <br />possible. Remaining contamination on the soil surface shall be treated with sodium hypochlorite <br />solution to oxidize the cyanide to less toxic cyanate. <br />Where ground conditions allow, the extent of contamination resulting from a release of cyanide <br />solution will be determined visually. After treatment, solution spills will be over - excavated to <br />remove all wet soil. <br />Where soil already was wet prior to the release or in other situations where the extent of potential <br />contamination can not be determined visually, CC &V initially shall excavate soil believed to be <br />contaminated. <br />Contaminated soil shall be placed on the VLF for recovery /use of any remaining reagent values, <br />or disposed of in compliance with applicable hazardous waste regulations. <br />A report of the spill and its remediation shall be retained in the files of the Environmental <br />Resources Department. <br />Releases to Surface Water <br />In the unlikely event that cyanide solution is released to Arequa Gulch, CC &V shall sample the <br />solution released (if possible), at established surface water sampling locations, and downstream <br />from but as close to the point of entry of the release as is safely possible. Standard sampling, <br />preservation, handling, and analytical methods shall be used and coordinated by a member of the <br />CC &V Environmental Resources Department. <br />In no case shall CC &V attempt to oxidize, neutralize, or otherwise treat cyanide once it has <br />entered Arequa Gulch. Since all cyanide treatment chemicals are themselves toxic to aquatic <br />life, and in situ treatment is only marginally effective at best, all efforts must focus on preventing <br />releases to surface waters. <br />Cyanide Emergency Response Plan <br />EMS: AGANA/CCV Printed Copies are Uncontrolled <br />G: \EMS \Plans \Emergency Response Plans \Cyanide Emergency Response Plan \CERP.doc <br />August 17, 2010 <br />Doe.# E -012 <br />Rcv 07 <br />