My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-02-28_REVISION - M1980244 (82)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2012-02-28_REVISION - M1980244 (82)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:49:12 PM
Creation date
3/15/2012 3:22:17 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REVISION
Doc Date
2/28/2012
Doc Name
VOL 7, Part 1: Spill Response Plan
From
CC&V
To
DRMS
Type & Sequence
AM10
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
188
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1.7.3 Management Commitment <br />The CC &V facility management is committed to provide the necessary manpower, equipment, and <br />materials to control and remove any quantity of oil discharged as outlined in this Spill Response Plan <br />and Spill Prevention Control Countermeasures Plan per §112.7(d)(2) of 40 CFR Part 112. <br />Signed: Title: Senior Vice President North America <br />Printed Name: Ben Guenther Date: <br />1.8 Plan Amendments, Record - keeping Requirements, and Plan Reviews <br />1.8.1 Plan Amendments <br />The SRP /SPCC will be reviewed, and amended as necessary, whenever: <br />There is a change in design, construction, operation, or maintenance at the site, which <br />materially effects the potential for discharge from the facility; <br />• During inspections or investigations by site personnel or regulatory entities it is determined <br />that the SPCC is ineffective; or if the general objectives of the plan are not being met; <br />• Upon receipt of notification from the U.S. EPA's Regional Director that the SPCC does not <br />meet one or more of the minimum requirements of the permit, the required changes will be <br />made and certification provided to the director; <br />• Commissioning or decommissioning of tanks; <br />• Replacement, reconstruction, or movement of tanks; <br />• Reconstruction, replacement, or installation of piping systems; <br />• Construction, or demolition that might structurally alter secondary containment structures; <br />• Changes of product or service; and <br />• Revision of standard operation or maintenance procedures at a facility that would have a <br />material affect on containment. <br />Any amendment under this section must be prepared within six months, and implemented as soon as <br />possible, but not later than six months following preparation of the amendment. Any technical <br />amendments made to the SPCC plan must be reviewed and certified by a professional engineer. <br />1.8.2 Record - keeping and Making Plans Available <br />A complete copy of the SRP /SPCC, including all attachments (reports, certifications, records, integrity <br />testing, etc.) will be retained for a period of at least three years. A signed, current copy of this <br />SRP /SPCC, including all necessary attachments will be retained onsite as long as industrial activities <br />occur at the CC &V Facility. The plan must be made available to the U.S. Environmental Protection <br />Agency and the CDPHE (Colorado Department of Public Health and Environment) for onsite review <br />during normal working hours. <br />1.8.3 Plan Review and Evaluation <br />In accordance with 40 CFR Part 112.5 (b) a complete review and evaluation of the SRP /SPCC must <br />be completed at least once every five years. Any necessary amendments, based on the review and <br />evaluation, must be prepared within six months of the evaluation and implemented as soon as <br />possible, but no later than six months following the preparation of the amendment. A signed <br />statement must be prepared by the person conducting the evaluation, stating that a review and <br />evaluation of the SRP /SPCC Plan was completed, and that the plan will or will not be amended as a <br />result. This statement will be kept with the SRP /SPCC plan as an attachment. A certified <br />professional engineer must review and certify any technical amendments. <br />Spill Response Plan <br />EMS: AGANA/CCV <br />G:\EMS1PIans \Emergency Response Plans\SRP PIan\SRP Plan.doc <br />Printed Copies are Uncontrolled <br />August 17, 2010 <br />Doc. # E -006 <br />Revision 05 <br />6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.