My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-02-28_REVISION - M1980244 (81)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2012-02-28_REVISION - M1980244 (81)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:49:12 PM
Creation date
3/15/2012 2:44:32 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REVISION
Doc Date
2/28/2012
Doc Name
VOL 6, Part 5: Reclamation Cost Estimate
From
CC&V
To
DRMS
Type & Sequence
AM10
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3 <br />Legend of Colors and Calculation Links <br />3- Legend <br />4 <br />List of Changes to this Model <br />4- Changes <br />5 <br />List of Assumptions <br />5- Assumptions <br />6 <br />Summary Cost Table for Current Estimate <br />6-Summary CurrentUpdate <br />7 <br />[Intentionally Blank] <br />[Intentionally Blank] <br />8 <br />2009 CC &V Reclamation Labor Rates <br />8 -Labor Costs <br />9 <br />2009 CC &V Materials and Services Costs <br />Matl and Services Costs <br />10 <br />2009 CC &V Reclamation Equipment Rates <br />Eqmt Costs <br />11 <br />2009 Demolition Costs <br />Demolition <br />12 <br />East Cresson - WildHorse (Excludes WHEX) Mine Reclamation Costs <br />East Cresson <br />13 <br />Wild Horse Extension and Grassy Valley Reclamation <br />WHEX Grassy Valley <br />14 <br />North Cresson Mine Reclamation Costs <br />N Cresson <br />15 <br />Main Cresson Mine Reclamation Costs <br />Main Cresson <br />16 <br />East Cresson Overburden Storage Area Reclamation Costs <br />E Cres OSA <br />17 <br />Squaw Gulch Overburden Storage Area Reclamation Costs <br />Squaw OSA <br />18 <br />Arequa Gulch (AGVLF) Chemical Closure and Reclamation Costs <br />AGVLF <br />19 <br />Squaw Gulch (SGVLF) Chemical Closure and Reclamation Costs <br />SGVLF <br />20 <br />#3 &4 Pads and Ajax Exploration Reclamation Costs <br />#3 &4 -Ajax <br />21 <br />Ironclad Facility and Access Corridor Reclamation <br />IronCladAccess <br />22 <br />VLF Ponds, Sediment Ponds, & Storm Water Control Basins Reclamation Costs <br />Basins <br />23 <br />Monitoring Well and Piezometer Closure Costs <br />Wells <br />24 <br />Growth Medium Stockpiles Reclamation Costs <br />GM Piles <br />25 <br />Road Reclamation Costs <br />Roads <br />26 <br />Powerline Removal Costs <br />Powerlines <br />27 <br />Reclamation of Building Footprint Areas <br />Bldg Footprints <br />28 <br />Mine Area Fencing Costs <br />Mine Area Fence <br />29 <br />Clean -up and Miscellaneous Costs Associated with Closure <br />Clean -up <br />30 <br />Revegetation Repairs and Maintenance <br />Reveg <br />31 <br />Ancillary Areas Reclamation <br />Ancillary <br />32 <br />Viewshed Conservation <br />Viewshed <br />33 <br />Mobilization and Demobilization Costs <br />Mob & Demob <br />34 <br />Post - Closure Monitoring of Heap Effluent, Gr. Water, Surf. Water, & Vegetation <br />Monitoring <br />Sheet <br />TABLE OF CONTENTS <br />CRIPPLE CREEK & VICTOR (CC&V) GOLD MINING COMPANY MINE LIFE EXTENSION <br />2011 RECLAMATION COST ESTIMATE <br />Description of Contents <br />Tab Name <br />2 -TOC <br />
The URL can be used to link to this page
Your browser does not support the video tag.