4. Storage of Water. In order to make deliveries to CC &V at a time when the water <br />furnished hereunder is needed and efficient, Cripple Creek shall make available 200 acre feet <br />annually of water stored in Cripple Creek Reservoir No. 2 and Cripple Creek Reservoir No. 3. <br />Deliveries from storage shall be to the West Fork of West Beaver Creek as it passes under Teller <br />County Road 81 and measurement of deliveries shall be at the Point of Delivery. All storage <br />water shall be delivered by December 31 of each year. <br />A. The parties acknowledge that Cripple Creek must make repairs to the valving <br />and water release mechanism in Cripple Creek Reservoir No. 2 that will require draining of the <br />reservoir, anticipated in the Summer of 2010 or Spring of 2011. CC &V shall have a right of first <br />refusal for the purchase of the water released for the purpose of making the repairs, at the lease <br />rate set forth in Paragraph 3B. If CC &V exercises the right of first refusal and takes delivery of <br />said water, then CC &V will request no further releases from storage until such time as Cripple <br />Creek Reservoir No. 2 has recovered its storage to historic March 15 levels. Releases will be <br />made to the West Fork of West Beaver Creek at the drain between April 15 and July 15 of the <br />year in which such construction is commenced. Cripple Creek shall provide CC &V with <br />specific advance notice, to the extent reasonably practicable of its anticipated drainage schedules <br />so that CC &V may take such efforts as it deems necessary for the exchange and storage of such <br />drainage releases into other vessels owned or controlled by CC &V or the City of Victor, or to <br />advise Cripple Creek that it will not be purchasing such releases. <br />5. Procedure for Delivery of Water. The parties agree that the lease of Cripple <br />Creek Water to CC &V will take place within the supply limitations of the Cripple Creek water <br />system, and that those limitations vary by season. The Parties will develop an annual delivery <br />schedule based on hydrologic conditions and consultation with the Parties' engineers, all as <br />constrained by Paragraph 12 hereof, and Cripple Creek shall provide delivery of the water <br />subject of this agreement at the time and in the amount requested by CC &V subject to the <br />limitations of the Cripple Creek water system and Paragraph 12. <br />6. Points of Delivery. The Cripple Creek Water to be delivered to CC &V will be <br />primarily from Cripple Creek's municipal water transmission line from Reservoir No. 2 at or <br />near the intersection of such transmission line with the West Fork of West Beaver Creek ( "Point <br />of Delivery "). The Parties agree to develop a plan for utilization of the Point of Delivery that is <br />reasonably satisfactory to both Cripple Creek and CC &V, and CC &V agrees to accept water <br />delivered at an alternate point of delivery to the extent practicable, including but not limited to <br />Gillette Well No. 5, as may be necessary for the maximum beneficial use of Cripple Creek's <br />water system and water rights, upon reasonable advance notice by Cripple Creek. Any decision <br />to deliver water out of Gillette Well No. 5 must be approved, in advance, by CC &V, which <br />approval will not be unreasonably withheld. <br />7. Measurement of Deliveries and Title Thereto. All of the Cripple Creek Water <br />delivered shall be measured at the Point of Delivery. CC &V agrees to ensure that measurement <br />devices at the Point of Delivery accurately measure the amounts of water delivered. Title to the <br />Cripple Creek Water delivered under this Agreement shall pass to CC &V when it is released at <br />the Point of Delivery, and CC &V shall be solely responsible for any and all transit losses or <br />other reductions in water supply as delivered to the Point of Delivery prior to CC &V's pumping <br />4 <br />