My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-02-28_REVISION - M1980244 (77)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2012-02-28_REVISION - M1980244 (77)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:49:12 PM
Creation date
3/15/2012 2:08:49 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REVISION
Doc Date
2/28/2012
Doc Name
VOL 6, Part 1: Design Summary & Drawings - Mill Facilities
From
CC&V
To
DRMS
Type & Sequence
AM10
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4 AlIS miurH <br />1 <br />Design Summary <br />Squaw Gulch High Grade Mill Facilities <br />1/24/2012 <br />Page 6of6 <br />the mixture is tumbled and water is added to produce a cohesive particle that is resistant to <br />dusting and disintegration. After the processed ore is agglomerated, it is conveyed to a <br />Processed Ore Stockpile. The agglomerated processed ore is then loaded and trucked to one of <br />the existing VLFs at the Cresson Project. <br />The clear filtrate from the Flotation Processed Ore Filters will be recycled back to the Processed <br />Ore Thickener for further use. The clear filtrate from the CIP Processed Ore Filters will be <br />recycled back to the High pH Thickener for further use. <br />
The URL can be used to link to this page
Your browser does not support the video tag.