My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-02-28_REVISION - M1980244 (75)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2012-02-28_REVISION - M1980244 (75)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:49:12 PM
Creation date
3/15/2012 1:49:17 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REVISION
Doc Date
2/28/2012
Doc Name
VOL 5, Appendix H: Technical Specifications
From
CC&V
To
DRMS
Type & Sequence
AM10
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
97
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ame0 <br />• coordination of all construction activities associated with CONTRACTOR; <br />• scheduling and coordinating construction activities with required CQA testing and activities; <br />• overseeing the construction quality control operations performed by CONTRACTOR; <br />• approve specific corrective measures to be implemented during construction when deviations <br />from the SPECIFICATIONS occur; <br />• ensure that required quality assurance testing has been performed in accordance with the <br />CQA Plan and to the satisfaction of the CQA Monitor; and <br />• ensure that the CQA personnel are provided with all documentation required in the CQA Plan <br />and project SPECIFICATIONS. <br />2.03 DESIGN ENGINEER: <br />In this CQA Plan, DESIGN ENGINEER refers specifically to AMEC. DESIGN ENGINEER is the <br />individual or firm responsible for the design and preparation of the DRAWINGS and SPECIFICATIONS. <br />DESIGN ENGINEER is responsible for approving all DESIGN and SPECIFICATION changes, <br />modifications, or clarifications encountered during construction. <br />2.04 CERTIFYING ENGINEER: <br />In this plan, CERTIFYING ENGINEER refers specifically to (To Be Determined). CERTIFYING <br />ENGINEER is the individual or firm responsible for certifying the construction was performed in compliance <br />with the DRAWINGS and SPECIFICATIONS. MANAGER and CERTIFYING ENGINEER shall be <br />responsible for the resolution of all quality assurance issues. <br />2.05 CONSTRUCTION QUALITY ASSURANCE MONITOR: <br />The CQA Monitor is the firm or individual responsible for performing the CQA tasks outlined in this CQA <br />Plan. The CQA Monitor is the official CQA representative of CC &V and has the responsibility of overseeing <br />the CQA aspects of the Work. In this CQA Plan the CQA Monitor is associated with the CERTIFYING <br />ENGINEER, and refers specifically to (To Be Determined). The CQA Monitor has the authority to stop any <br />aspect of the Work that is not in compliance with the CQA Plan. Work would then be resumed once <br />corrective action has been approved by MANAGER. The specific responsibilities of the CQA Monitor <br />include: <br />• review the DRAWINGS, SPECIFICATIONS, and related guidance documents; <br />• review all CONTRACTOR QC submittals and make appropriate recommendations; <br />• obtain preconstruction and construction samples and perform material evaluation testing as <br />required; <br />• monitor foundation preparation activities as discussed in Section 6.02.01 and material <br />placement as discussed in Section 6.02.02; <br />• assure that testing equipment used and tests performed are conducted according to <br />SPECIFICATIONS and industry standards; <br />Section 01400.1 Page 2 of 10 January 14, 2011 <br />Earthworks CQA Plan Revision 0 <br />S \Protects \1125G Squaw Gulch Valley Leach Facililty Design \I - Tech Specs \01400 1 r0 doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.