My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-02-28_REVISION - M1980244 (75)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2012-02-28_REVISION - M1980244 (75)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:49:12 PM
Creation date
3/15/2012 1:49:17 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REVISION
Doc Date
2/28/2012
Doc Name
VOL 5, Appendix H: Technical Specifications
From
CC&V
To
DRMS
Type & Sequence
AM10
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
97
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6.03.03 POLYETHYLENE PIPE AND FITTINGS: <br />During polyethylene pipe installation, the CQA Monitor shall observe and document that the installation is <br />in compliance with the project SPECIFICATIONS. CQA monitoring of the polyethylene pipe and fittings <br />will include the following: <br />PART 7.0 DOCUMENTATION <br />Placement - Observation that the handling procedures used do not damage the pipe, backfill is <br />placed in compliance with the requirements of the project SPECIFICATIONS so as not to damage <br />the pipe, any foreign material is removed from the interior of the pipe and indentations on the pipe <br />are within the MANUFACTURER's allowable limits. <br />Joints and Connections - Monitoring of the jointing and connection operations to verify that the <br />CONTRACTOR follows the SPECIFICATIONS and the pipe MANUFACTURER's <br />recommendations, verification that the pipes are clean when installed, that perforated sections of <br />pipe are aligned properly prior to connection, pipe boot connections are made in the field using <br />the specified rings and clamps, and plastic ties are used to connect the secondary perforated pipes <br />to primary perforated pipes. <br />Nondestructive Testing - Observe any required testing of the pipe to verify compliance with the <br />project SPECIFICATIONS. <br />Documentation kept by the CQA Monitor shall consist of daily record- keeping, documentation of <br />construction problem resolutions, documentation of design and SPECIFICATION changes, photographic <br />records, weekly progress reports, chain of custody forms for test sample tracking, and a Construction <br />Certification Report. <br />7.01 DAILY RECORD KEEPING: <br />The CQA Monitor shall keep daily records consisting of field notes, observation and testing data sheets, <br />summary of the daily meeting with the INSTALLER or CONTRACTOR, and reporting of construction <br />problems and resolutions. This information shall be submitted on a regular basis to the MANAGER for <br />review. <br />7.02 GEOSYNTHETIC OBSERVATION AND TESTING FORMS: <br />The CQA Monitor shall document geosynthetic observations and test results on forms which include the <br />following information: <br />• date, project name, location, and weather data; <br />• identification of panel or seam numbers; <br />• description of ongoing construction, detailing deployment areas; <br />• numbering system identifying test or sample number; <br />• location and identification of repairs and date of repair; <br />• length and/or thickness measurements for geomembrane panels or seams; <br />• welding machine temperatures and settings; <br />Section 01400.2 Page 9 of 11 January 14, 2011 <br />Geosynthetic CQA Plan Revision 0 <br />S \Protects \1125G Squaw Gulch Valley Leach Facililty Design \I - Tech Specs \01400 2 r0 doc <br />amee <br />
The URL can be used to link to this page
Your browser does not support the video tag.