My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-02-28_REVISION - M1980244 (75)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2012-02-28_REVISION - M1980244 (75)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:49:12 PM
Creation date
3/15/2012 1:49:17 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REVISION
Doc Date
2/28/2012
Doc Name
VOL 5, Appendix H: Technical Specifications
From
CC&V
To
DRMS
Type & Sequence
AM10
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
97
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PART 3.0 LINES OF COMMUNICATION <br />The CQA Monitor shall be capable of direct communication with the MANAGER, DESIGN <br />ENGINEER, CERTIFYING ENGINEER and CONTRACTOR at all times. Deficiencies that can be <br />easily remedied, such as unsatisfactory test results, will be dealt with directly between the CQA Monitor, <br />INSTALLER , and /or CONTRACTORS. <br />If there is a disagreement among the DESIGN ENGINEER, CERTIFYING ENGINEER and/or <br />MANAGER that can not be resolved among themselves, MANAGER shall present the matter to CC &V <br />with MANAGER related recommendations and CC &V shall decide the matter with such decision being <br />final. <br />PART 4.0 DEFICIENCIES <br />When deficiencies (items that do not meet project requirements) are discovered, the CQA Monitor shall <br />immediately determine the nature and extent of the problem and notify the INSTALLER or <br />CONTRACTOR. If unsatisfactory test results identify a deficiency, additional tests will be performed to <br />define the extent of the deficient area. <br />The INSTALLER or CONTRACTOR shall correct the deficiency to the satisfaction of the CQA <br />Monitor. If the CONTRACTOR is unable to correct the problem, the CQA Monitor will notify the <br />MANAGER and CERTIFYING ENGINEER who will assist in problem resolution. If the solution <br />involves a design revision, the DESIGN ENGINEER shall also be contacted. <br />The corrected deficiency shall be retested and/or approved by the MANAGER and CERTIFYING <br />ENGINEER before any additional related work is performed by the INSTALLER or CONTRACTOR. <br />All retests and related documentation shall be recorded by the CQA Monitor and included in the final <br />Construction Certification Report. <br />PART 5.0 MEETINGS <br />ameel <br />This section identifies and describes the meetings to be held during the coarse of the construction. <br />Meetings shall be held in order to clearly define construction activities and goals in order to facilitate <br />construction. <br />5.01 PRECONSTRUCTION MEETING: <br />The MANAGER will hold a preconstruction meeting at the site prior to the start of construction. The <br />DESIGN ENGINEER, MANAGER, CERTIFYING ENGINEER, CQA Monitor, INSTALLER, <br />CONTRACTOR, and others designated by the MANAGER shall attend this meeting. The purpose of <br />this meeting will be to: <br />■ review the construction DRAWINGS, CQA Plan, and project SPECIFICATIONS; <br />• define the responsibilities of each party; <br />• define lines of communication and authority; <br />• review method of documentation, testing procedures, and reporting inspection data; <br />Section 01400 2 Page 4 of 11 January 14, 2011 <br />Geosynthetic CQA Plan Revision 0 <br />S \Protects \11250 Squaw Gulch Valley Leach Facililty Design \I - Tech Specs \01400 2 r0 doc <br />