Laserfiche WebLink
Hydrologic <br />Element <br />Drainage Area <br />(MI2) <br />Peak Discharge <br />(CFS) <br />Time of Peak <br />Volume <br />(AC -FT) <br />J1 <br />0.1662 <br />8.0 <br />01Jan2010, 12:39 <br />1.4 <br />J2 <br />0.1504 <br />7.7 <br />01Jan2010, 12:30 <br />1.3 <br />J3 <br />0.0434 <br />4.4 <br />01Jan2010, 12:12 <br />0.6 <br />J4 <br />0.1304 <br />7.1 <br />01Jan2010, 12:18 <br />1.1 <br />Outlet <br />0.1662 <br />8.0 <br />01Jan2010, 12:39 <br />1.4 <br />Reach 1 <br />0.1504 <br />7.6 <br />01Jan2010, 12:39 <br />1.3 <br />Reach -2 <br />0.1304 <br />7.0 <br />01Jan2010, 12:30 <br />1.1 <br />Reach -3 <br />0.0434 <br />4.4 <br />01Jan2010, 12:15 <br />0.6 <br />Reach -4 <br />0.0410 <br />2.1 <br />01Jan2010, 12:20 <br />0.3 <br />Subbasin -1 <br />0.0158 <br />0.8 <br />01Jan2010, 12:12 <br />0.1 <br />Subbasin -2 <br />0.0200 <br />0.9 <br />01Jan2010, 12:17 <br />0.2 <br />Subbasin -3 <br />0.0434 <br />4.4 <br />01Jan2010, 12:12 <br />0.6 <br />Subbasin -4 <br />0.0460 <br />1.0 <br />01Jan2010, 12:10 <br />0.3 <br />Subbasin -5 <br />0.0410 <br />2.1 <br />01Jan2010, 12:06 <br />0.3 <br />Project: Phase 2 Simulation Run: 2 -yr 24 -hr <br />Start of Run: 01Jan2010, 00:00 <br />End of Run: 02Jan2010, 00:01 <br />Compute Time: 24Jun2011, 11:37:11 <br />Volume Units: AC -FT <br />Basin Model: CCV Phase 2 <br />Meteorologic Model: 2 -yr 24 -hr Storm <br />Control Specifications: Control 1 <br />